Laserfiche WebLink
identify potentially impacted residences (minimum <br /> noise level increases of 5 dB) , and if feasible , <br /> offer mitigating measures to minimize the impacts . <br /> • Mitigating impacts at individual residences could <br /> take the form of constructing sound walls along the <br /> roadways , soundproofing homes , or building <br /> barriers/fences around specific portions of yards to <br /> provide shielded outdoor spaces . Because of the <br /> nature of the development in the area , solutions <br /> would have to be tailored to each specific situation . <br /> • See FEIR, Section 4 . 16 . <br /> X-3 . Potentially Significant Impact • Proximity of <br /> Noise Sensitive Uses to Agricultural Machinery <br /> [ Impact 4 . 16-31 <br /> Proposed noise-sensitive land uses adjacent to <br /> agricultural lands could be significantly impacted by <br /> agricultural machinery and equipment noise . <br /> Finding : Chanes or alterations have been required in, <br /> or incorporated into, the Project which avoid or <br /> substantially lessen the significant environmental effect <br /> as identified in the FEIR to a non-significant level . <br /> These mitigation measures are listed below. <br /> Statement of Fact : The impact will be reduced by the <br /> following : <br /> • Earth berms , sound walls , or other mitigation <br /> identified at the Specific Plan stage must be <br /> constructed to reduce noise levels where <br /> noise-sensitive land uses would abut agricultural <br /> fields . Alternatively, a buffer zone between <br /> proposed noise-sensitive land uses and agricultural <br /> lands could be provided. A 500-foot wide on-site <br /> buffer zone would reduce noise levels -generated by <br /> agricultural machinery substantially. <br /> • See FEIR, Section 4 . 16 . <br /> X-4 . Potentially Significant Impact • Construction Noise <br /> [ Impact 4 . 16-4] <br /> Construction noise during the 17-year development period <br /> would be a significant noise impact . <br /> Finding : Changes or alterations have been required in, <br /> or incorporated into, the Project which avoid or <br /> C2-76 <br /> 0189r/0202r <br />