substantially lessen the significant environmental effect <br /> as identified in the FEIR to a non-significant level . <br /> These mitigation measures are listed below. The <br /> identification of this as a significant unmitigable <br /> impact in Section 6 . 4 of the FEIR is incorrect . <br /> Statement of Fact : The impact will be reduced by the <br /> following : <br /> • Noise impacts during construction can be mitigated by <br /> controlling the hours of construction . This may be <br /> appropriate in some situations and must be considered <br /> on a case-by-case basis as construction proceeds in <br /> the new community. <br /> • All construction equipment powered by internal <br /> combustion engines must be properly muffled and <br /> maintained. The prudent selection of equipment , <br /> along with the use of proper mufflers , shall limit <br /> construction-related noise generated by a particular <br /> piece of equipment of 85 dBA when measured at a <br /> distance of 50 feet from the piece of equipment <br /> operating at its noisiest mode . <br /> • All stationary noise-generating construction <br /> equipment, such as air compressors , should be located <br /> as far as possible from existing residences . Such <br /> equipment must be acoustically shielded where <br /> possible. <br /> • Quiet construction equipment , particularly air <br /> compressors , must be selected whenever possible . <br /> • Although this is identified as a significant <br /> unavoidable impact on Section 6 . 4 of the FEIR, it is <br /> identified as mitigable to insignificance in <br /> Section 2 (page 2-57) . Although it is not possibly <br /> to fully mitigate this impact, with the addition of <br /> the mitigated measures, the remaining -short term <br /> impacts could be considered insignificant . <br /> • See FEIR, Section 4 . 16 . <br /> II . CUMULATIVE IMPACT MITIGATION MEASURES <br /> The following information is presented to comply with the <br /> CEQA Guidelines , which require a discussion of the <br /> potential cumulative impacts that could result from the <br /> Project in conjunction with other projects in the <br /> vicinity which are pending , have been recently approved, <br /> C2-77 <br /> 0189r/0202r <br />