Laserfiche WebLink
• Limited use of groundwater from on- maintain facilities for water treatment and <br /> site wells,particularly during dry periods. supply, wastewater collection and treatment, <br /> If quality problems relating to secondary storm drain collection and disposal, trash <br /> standards are identified,treatment of collection and disposal and other services <br /> groundwater could be provided. needed for the proposed urban development. <br /> Such a service district or districts would <br /> If storage is needed so as to permit the use exist in both counties and be formed under a <br /> of wet period flows only,the following will joint agreement between the two counties. <br /> be pursued: Such a district or districts would be totally <br /> supported by the community with no <br /> • Through an exchange agreement, financial commitment needed from either <br /> storage in the San Luis Reservoir south of county. <br /> the project. <br /> Pacific Gas &Electric power and gas <br /> • Through an exchange agreement, facilities exist in the general area. It is <br /> storage in the future Los Vaqueros Reser- expected that such facilities are adequate in <br /> voir of the Contra Costa County Water size to handle the expected additional load <br /> District. generated by the proposed project. <br /> • On-site storage at several possible lo- Co-Generation: <br /> cations. <br /> Electrical power cogeneration plants are be- <br /> Through the establishment of a service coming common in the Central Valley. <br /> district, the water will be treated for potable Plants exist and others are being proposed in <br /> use and distributed to the proposed develop- Stockton,Lathrop,Tracy and Westley <br /> ment. which use coal, farm waste,discarded <br /> automobile tires and natural gas as fuel. As <br /> It is possible that effluent from a wastewater the population of Northern California <br /> treatment facility could be recycled by a grows, it is expected that additional cogen- <br /> land disposal process during the summer eration plants will be needed to supplement <br /> months. If this were found feasible, a the power supply by Pacific Gas &Electric <br /> contract with a nearby fanning operation Co. <br /> could be negotiated which would allow for <br /> the supply of effluent. It is planned that a portion of the project site <br /> be set aside for industrial use, and it is <br /> Utilities: expected that a cogeneration facility would <br /> be a compatible use in this area. <br /> It is proposed that utility service districts be <br /> formed which would operate, manage and <br /> Master Plan Policies <br /> 4.9 <br />