Laserfiche WebLink
11 . Please include a copy of any studies ( soils , geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site . <br /> C . PROJECT CHARACTERISTICS <br /> 1. Services : Indicate how the following services will be provided <br /> for your project and availability of service . <br /> a . Water Supply: The project will develop its own domestic water sural y <br /> b. Sewage Disposal : The DroJect will provide its own sewage collection & treatmE <br /> C . Storm Drainage : Mountain _House Creek will be the major storm faci 1 i t <br /> drainage disposal channel . <br /> If an extension of any of the above is ' necessary, indicate <br /> which service( s ) , what agency will be providing the <br /> service( s ) , and the distance of the extension( s ) : <br /> Extension of existing supply and disposal systems is not planned. <br /> d. Natural Gas : Pacific Gas & Electric <br /> e . Electricity: Pacific Gas & Electric <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name ) : <br /> _ I-205/I-580, Byron Bethany Rd. , Patterson Pass Rd and Grant Line Road <br /> g . Fire. Distance to nearest fire station: To be determined <br /> h . Schools : Schools to be included in ultimate project development <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject ( specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal , alterations to drainage, <br /> removal of existing structures , number of trees removed, etc. ) . <br /> Some minor earthwork and grading will be necessary to accommodate the proposed <br /> development. Preservation of mature stand of trees is planned Existing farm <br /> structures found not useful for the Droposed development will be removed <br /> 3 . Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> To be determined. <br /> Types of emissions and sources associated with project <br /> Predominately from automobile emissions <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project Predominately natural gas supplied by a P G &E pipeline <br /> traversing through the site. <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? X NO YES <br /> 4 . How much agricultural land will be removed from production? <br /> Agricultural land will be phased into other uses over a 10-20 year period <br /> Irrigated Ac. (San Joaquin Co. ) Not irrigated 690 Ac. (Alameda County) <br /> 1500 Ac. (Alameda County) 170 Ac. (San Joaquin Co. ) <br /> General Plan Map Amendment 13 ( 6-86 ) <br />