My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1 2003-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EMBARCADERO
>
6651
>
2200 - Hazardous Waste Program
>
PR0522357
>
COMPLIANCE INFO_FILE 1 2003-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2020 5:27:37 PM
Creation date
6/3/2020 9:14:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1 2003-2006
RECORD_ID
PR0522357
PE
2220
FACILITY_ID
FA0014885
FACILITY_NAME
MARINA WEST MARINE SERVICE
STREET_NUMBER
6651
STREET_NAME
EMBARCADERO
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
09814007
CURRENT_STATUS
02
SITE_LOCATION
6651 EMBARCADERO DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2220_PR0522357_6651 EMBARCADERO_FILE 1 2003-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK REQUEST FORM <br /> ns-- <br /> Date of Request 11/10/03 Completion Date 11/12/03 <br /> J <br /> Project Marina West Project #/ Task # 585 <br /> Site Address 6651 Embarcadero Dr., Stockton <br /> Project Mgr. G. Stahl Personnel S. Garvey <br /> ' Client Contact Chris McDougall Phone # Cell: 607-7189 <br /> Mike Spence Office: 951-1551 <br /> Reg. Contact Jerry Lile, DTSC Phone # (916) 255-3744 <br /> Approval Completion Date <br /> ST RER VTSF. AND DOCT TMENT EXCA V A TTC)N CYST.T EC I SC)TT, S A MPT,ES <br /> • Review and familiarize yourself with Workplan and Site Safety Plan. <br /> 20-yard rolloff bin with liner is scheduled to be onsite Tuesday. Marty Thorpe <br /> is scheduled to be onsite at 8:00 Wednesday to conduct excavation. Berry bushes <br /> have already been trimmed back and silt fence installed. Most boats and all loose <br /> equipment has been moved. <br /> Conduct tailgate safety meeting and go over excavation procedures with Thorpe <br /> ' personnel. Make sure they understand that it is very important not to push any <br /> material over the levee. Make sure they understand that we don't want to go any <br /> deeper than 3 inches! Have additional silt fence installed to cover entire excavation <br /> ' area. <br /> • Have Thorpe scrape at most 3 inches of material from the work area and load into <br /> rolloff bin. They must take care not to introduce paint chips to post-excavation <br /> surface (try not to drive over excavated area, etc.) Follow up with shovels and <br /> brooms to make sure all possible contaminated material has been removed.and-stored <br /> in rolloff bin. Silt fence to remain in place. �Hake_Thorpe line excavation with <br /> ' <br /> LV.4een. - <br /> • Map excavation features and dimensions and take photos. Make additional tic <br /> ' marks on edge of asphalt with white paint at 10-foot intervals for future reference. <br />
The URL can be used to link to this page
Your browser does not support the video tag.