Laserfiche WebLink
WORK REQUEST FORM <br /> ns-- <br /> Date of Request 11/10/03 Completion Date 11/12/03 <br /> J <br /> Project Marina West Project #/ Task # 585 <br /> Site Address 6651 Embarcadero Dr., Stockton <br /> Project Mgr. G. Stahl Personnel S. Garvey <br /> ' Client Contact Chris McDougall Phone # Cell: 607-7189 <br /> Mike Spence Office: 951-1551 <br /> Reg. Contact Jerry Lile, DTSC Phone # (916) 255-3744 <br /> Approval Completion Date <br /> ST RER VTSF. AND DOCT TMENT EXCA V A TTC)N CYST.T EC I SC)TT, S A MPT,ES <br /> • Review and familiarize yourself with Workplan and Site Safety Plan. <br /> 20-yard rolloff bin with liner is scheduled to be onsite Tuesday. Marty Thorpe <br /> is scheduled to be onsite at 8:00 Wednesday to conduct excavation. Berry bushes <br /> have already been trimmed back and silt fence installed. Most boats and all loose <br /> equipment has been moved. <br /> Conduct tailgate safety meeting and go over excavation procedures with Thorpe <br /> ' personnel. Make sure they understand that it is very important not to push any <br /> material over the levee. Make sure they understand that we don't want to go any <br /> deeper than 3 inches! Have additional silt fence installed to cover entire excavation <br /> ' area. <br /> • Have Thorpe scrape at most 3 inches of material from the work area and load into <br /> rolloff bin. They must take care not to introduce paint chips to post-excavation <br /> surface (try not to drive over excavated area, etc.) Follow up with shovels and <br /> brooms to make sure all possible contaminated material has been removed.and-stored <br /> in rolloff bin. Silt fence to remain in place. �Hake_Thorpe line excavation with <br /> ' <br /> LV.4een. - <br /> • Map excavation features and dimensions and take photos. Make additional tic <br /> ' marks on edge of asphalt with white paint at 10-foot intervals for future reference. <br />