Laserfiche WebLink
AR TIVE <br /> kept closed except when being added to or removed from the container. <br /> Containers holding liquids and dispersible solids must also be kept airtight. <br /> Containers of paint and paint thinner should be stored in the designated <br /> enclosed, storage areas. The containers or materials should not come into <br /> contact with rainwater or left open to evaporate. <br /> Standard Operating Procedures (SOPS) <br /> SOPS will be developed and implemented by for painting operations, vehicle <br /> maintenance and washing, and building maintenance. SOPS will be <br /> developed with the intent of reducing the amount of waste generated from <br /> operations discharging water into the oil water separator. <br /> Managers/Supervisors will be responsible for the development and <br /> implementation of the procedures. Review and assessment of SOPs for each <br /> department will occur annually. <br /> Training <br /> Training will be provided for department managers, facility operators, and <br /> employees. Training will include job specific techniques, safety requirements, <br /> SOPs, hazardous material and hazardous waste management, and source <br /> reduction measures. Training facility operators will decrease the amount of <br /> waste generated at the source by reducing the amount of spills and leaks that <br /> occur from operator error. A description of general annual training is <br /> provided in Section III General Administrative Controls. <br /> Specific Job Training for Painters <br /> Training provided for department managers and painting operations staff will <br /> focus on job specific techniques and safety requirements. In particular, <br /> painters will be trained on estimating and ordering the amount of paint <br /> needed for a project and receive guidance regarding which preferred products <br /> to order to complete the project. SOPS will require that the current supply of <br /> painting materials be checked prior to the ordering new materials. <br /> The four-year numerical goal for latex paint is 25%. <br /> Stockton Unifted School District NETWORK ENVIRONMENTAL SYSTEMS,INC. <br /> Hazardous Waste Source Reduction Plan 20 <br />