My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
1214
>
2200 - Hazardous Waste Program
>
PR0541715
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:44:59 AM
Creation date
6/3/2020 9:22:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541715
PE
2227
FACILITY_ID
FA0004061
FACILITY_NAME
MCCORMICK & BAXTER CREOSOTING
STREET_NUMBER
1214
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95201
APN
14520001
CURRENT_STATUS
02
SITE_LOCATION
1214 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2227_PR0541715_1214 W WASHINGTON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Evacuatic:i is annouce onessential. pe:- <br /> scnnel would proceed to a designated assembly area as <br /> list-ed below: <br /> Location Assembly Area <br /> Retort Area Lab Office <br /> Machine Shop Lab Office <br /> Boiler Room Lab Office <br /> Tie Plant « <br /> Tie Doweling Lab Office <br /> Pole Shed Main Office <br /> Yard Areas Main Office <br /> Scotch Kiln Main Office <br /> Pole Peeler Main Office <br /> 3. Upon arrival at the assembly area, personnel will be <br /> given specific instructions by the Emergency Coordina- <br /> tor or designated on-call coordinators. Personnel will <br /> not evacuate the site until directed to do so by the <br /> Emergency Coordinator. <br /> 4. When directed by the Emergency Coordinator to evacuate <br /> the site, personnel will use their own vehicles (win- <br /> dows closed, air conditioner/heater off, vents closed) <br /> and proceed as directed by emergency team personnel to <br /> the proper evacuation route or the main gate, if avail- <br /> able. <br /> Access and Traffic Routing for Emergency,._Response <br /> During an emergency, roadblocks --and traffic coordination are <br /> performed by plant emergency personnel, eliminating conges- <br /> tion in' the crisis area and allowing:•fl-ow' of 'evacuated .per- <br /> sonnel and emergency personnel and equipment to. and from the <br /> crisis area. Roadways through the facility- provide suffi- <br /> cient aisle space for movement of personnel and emergency <br /> equipment. <br /> Authority <br /> The facility Emergency Coordinator for McCormick and Baxter <br /> will also perform the duties of the Emergency Coordinator <br /> regarding the requirements of 40 CFR Part 264 Subpart D. <br /> The Emergency Coordinator has been delegated complete <br /> authority to utilize whatever on-site or off-site resources <br /> are necessary to fully implement the Contingency Plan to <br /> respond to emergencies. <br /> X-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.