Laserfiche WebLink
Yes �n comment <br />90 Day Acc=ulation in Twiks (cont.1-1 <br />(Section 66262.34) <br />Are sources of impressed current impected at <br />least every other month to ensure proper <br />functioning? (66265.195(b)(2)] <br />I ME•Elm W=`Mz <br />If a tank system has had a leak or spill, or is <br />unfit for use, was it immediately removed from <br />service, and did the generator:? (66265.196-] <br />(a) Comply with applicable requirements of <br />section 66265.56? ( page 24) <br />(b) Immediately stop the flow of HW into the <br />--Ystern, and inspect to determine the cause of <br />the release? <br />If the release was from a tank system, did the <br />generator (if'possible) remove enough waste to <br />prevent further release and alla%r inspection and <br />repair? (66265.196(c)(1)) <br />If the release was to a secondary containment <br />system, were all released materials removed <br />within 24 hours (or in a timely manner)? <br />[66265.196(c)(2)) <br />If the release was to the environment, did the <br />generator immediately visually inspect the <br />release, and: (66265.196(d)-] <br />(1) Contain it to prevent further migration <br />to soils or surface waters? <br />(2) ReMOVe and properly dispose of any visible <br />contamination of the soil or surface water? <br />Was the leak or spill of Hw less than or equal <br />to one pound and immediately contained and <br />cleaned up? (66265.196(e)(2)) <br />If not, was the spill or leak reportod to the <br />D2Partlmmt wn 24 hours? [66265.196(e,)(1)] <br />If the release was to the environment, was a <br />full report (see 66265.196(e)(3)) submitted to <br />the Department within 30 days of detection? <br />(6265.196(e)(3)] <br />Revised 7/15/91 Page V- <br />