Laserfiche WebLink
04/23/2004 20:13 408971 35 SSS INC PAGE 85 <br /> . <br /> Monitoring System Certification- Page 3 of 3 <br /> Site Address: 2575 Country Club Blvd. a..Plymouth _. Date of Testing/Servicing: 3124104 <br /> F. in -"rank Gauging/ SIR Equipment: 0 Check this box if tank gagging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> Thi; section niust be completed if its-tfinlc gauging equipment is used to per['®.rm leak detection monitoring. <br /> Com Mete the follouling checklist: <br /> d Yes 11NO Has all input wiring been inspected for proper entry and termination, including testing for,round faults? <br /> ❑Yes Q NO Werc all tank gauging probes visually inspected for damage and.residue buildup? <br /> ®Yes ❑ No* Was accuracy of"system product level readings tested? <br /> ❑Yrs ❑ No* Was accuracy of systell,water level readings tested'? <br /> ❑Yes 1 ❑ No"' Werc all probes reinstalled properly'? <br /> ❑Yes ❑ No* Were all items on the equipment tnanu.facturer's maintenance checklist completed? ` <br /> *in Section R below,describe how and when these deficiencies were or will be corrected. <br /> G. Line:Lealc Detectors (I.LD)- ❑ Check this box if LLD's are not installed. <br /> Complete the'I'olioovin checklist: <br /> s Yes ❑ Noy` For equipment start-up or annual equipment certification was a leak simutatcd to verify LLD performance"? <br /> ❑ N/A (Cheek all that apply) Simulated leak reale: 3 3 g.p.h.(1); ❑ 0.1 g.p_h.(2.); ❑ 0.2 g.p.h.(2.). <br /> Notes_ 1. itcquircd.Cor equipment start-up eertifiesltion and annnstl nerrifieation. <br /> 2. Unless mandated by local age ne ,certification required only for electronic LLD start-up. <br /> 9 Yrs ❑ No" Wereall LLD's confirmed operational And accurate within regulatorX requirements? <br /> M Yes ❑ No* Was the testing apparatus properly calibrated'? <br /> ❑Yes ❑ NO For meclia.n:ieal LLD's,does the LLD restrict product flow if it detects a leak? <br /> ® N/A <br /> 9 Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> ©Nl.AL <br /> ®Ycs ❑ No* For electronic LLD's,does the turbine automatically shut off if any portion of the nnonitoring system is disabled <br /> ❑ N/A or disconnected? <br /> ®Yes ❑ No" For elceironie LLD's,docs the turbine automatically shut off it*any portion of the monitoring system <br /> p N/A rualfunctions or fails a test? <br /> 3 Vcs ❑ No's For ele,=osuc LLD's,have all accessible wiring con.nectirtm,heer visnally inspected? <br /> ❑ N/A <br /> ®Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section.14 below,describe !tow And when these deficiencies were or will be corrected. <br /> IL Comments: <br />