My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 2:09:10 PM
Creation date
6/3/2020 9:43:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2004
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_1995-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
431
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
04/23/2004 20: 13 408971 35 SSS INC PAGE 06 <br /> Monitoring System Certification <br /> 7 Monitoring Site Plan <br /> 2575 Country Club Blvd. @ Plymouth in Stockton <br /> 3/17/04 <br /> �. . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> _ <br /> . . . . . . L <br /> _ . . . . _ L <br /> - <br /> . . . . . . . <br /> . . . . . . . . . . . ./;g(o <br /> . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . <br /> Date map was drawn 1 sq/ <br /> Instructions <br /> On your site plan, show the general layout of tanks and piping. C:iearly identify vocations of the fulluwir ig equipment, if <br /> installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill <br /> containers, or other secondary containment areas; mechriniUdl u1 electronic line leak detedtoro; and in tank liquid <br /> level probes(if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />
The URL can be used to link to this page
Your browser does not support the video tag.