Laserfiche WebLink
ITEM #5 CCsAMFNT: <br />RESPONSE: <br />SE: <br />ITEM #6 COIV" LENT : <br />RESPONSE - <br />ITEM # CONMZINT: <br />RESPONSE: <br />PI` M #8 Ct7MMZN 1: <br />A & S ENGINEERING INC. <br />PLANNING • ENGINEERING a CONSTRUCTION MANAGEMENT <br />45 QUAIL COURT, STE. 303, WALNUT CREEK, CA. 94596 - PHONE: 510-933-0578 - FAX 510-933.0588 <br />All lines shall be tested for at least 30 minutes, not 20 minutes as <br />proposed <br />All lines will be tested for 30 minutes <br />Provide detailed information on how complete pump shut off is done. <br />Submit drawing if possible. <br />If liquid is detected in either the turbine pod or underneath the dispenser, <br />the sub pump is shut off and may only be started by an auLie^.zed service <br />technician <br />Specify how tanks will be anchored. Submit calculation with Engineer <br />certification if it is not provided by the tank manufacturer. <br />The tanks are anchored by deadmen anchors. Please see drawing # I'P-8 <br />The buoyancy calculations from "Xerxes Corporation" ars, attached. <br />In future, please submit a site specific and precise ;clan for approval. A <br />non -site specific and not precise plan will not be accepted for review-4-ig <br />RESPONSE: Please see the attached site specific equipment breakdowns from Shell <br />Oil's equipment suppliers. The prices have been covered for <br />,onfidentiality purposes by the suppliers. <br />Please review as soon as possible. Feel free to call me at (510) 933-0578 if you have any questio.r, or <br />comments <br />Sincer Yo , <br />ince Padilla <br />General Manager <br />STP; jc <br />