Laserfiche WebLink
Primary Piping System Installation <br /> AA ?ON, YOUT P TIE�M <br /> 1 T t1 ;�7RCTIONS FOR While handling,storing,and transporting the pipe,it <br /> � A can sometimes incur rough treatment Therefore,Inspect <br /> jRgYIARY Pkt#9C1U PIFFNG all pipe surfaces for possible damage to the pipe wall, <br /> spigot,and bell ends. Inspect fittings for any signs of <br /> damage. Damaged sections of pipe must be repaired or <br /> 1. Proper installation is the key to achieving a highly reliable, cut out and replaced. Damaged fittings must be re- <br /> adhesive bonded,matching taper,bell and spigot joint. placed. If in doubt about damage,contact your local <br /> 2. Matching taper angles on spigot and bell ends make it Smith Fibercast distributor or representative. <br /> possible to lock-up a joint by wedging the spigot into the Exposing machined surfaces to direct sunlight will result in <br /> bell so that it takes significant force to separate them. loss of joint bonding strength. Because the degree of weath- <br /> Proper lock-up is essential. ering,surface degradation,and subsequent effect on bond <br /> 3_ A very thin line of adhesive(called the bond line or glue strength varies greatly depending on geographic location and <br /> line)between the two matching tapered surfaces is a n- related factors such as cloud cover,seasonal hours of day- <br /> tial to achieve optimum joint strength. light,intensity of sunlight,humidity,etc.,it is difficult to place <br /> 4. Cool weather installations require different bonding proce- a fixed time limit on the acceptable amount of ex- <br /> dures from warm weather installations. posure. Cover exposed areas of pipe and fit- l/ <br /> 5. Proper installation results in joint strength equivalent to or tings to protect from UV damage.In all in- � <br /> stronger than most piping systems. stances where protective coverings are <br /> 6. To achieve the most reliable piping system,it is essential removed from machined surfaces <br /> that the installation crew be familiar with the joining and ultraviolet exposure exceeds <br /> techniques described in this manual.Note especially one day, corrective action <br /> pages 5-11. must be taken. <br /> 7. Proper and safe methods of testing are recommended to <br /> assure that the bonded joints in the piping system have A. Layout <br /> been properly bonded and cured.See pages 13-14 and Advance planning of the piping layout is essential.It will make <br /> 25. servicing the system easier and can reduce the quantities of ma- <br /> terial required. OTE:The scarfed containment pipe must <br /> be positioned over the product pipe before bonding the <br /> I S'yS p uct pipe. <br /> MS See page 5 for detailed information on piping layout. <br /> The adhesive bonded,tapered bell and spigot joint is the B. Installation Crew Size and Organization <br /> primary joining method for Each installation is different,and requirements change de- <br /> 2"-4" (50 mm-100 mm) Pipe-to-Fittings pending on whether the installation is simple—consisting of <br /> pipe-to-fittings.However, long,straight runs—or complex. Requirements are also affect- <br /> T.A.B. spigots can be ed by pipe size, installation temperature,and similar influ- <br /> bonded into smooth ta- ences. See Table 2. <br /> pered fittings. <br /> The T.A.B. (threadedSpigot Bell TABLE 2.Suggested Units of Labor for Installation <br /> 'D <br /> and bonded)joint is the <br /> primary joining method for Tapering <br /> pipe-to-couplings. The Pipe Cutting Hand Tool Power Tool Joint <br /> mechanical locking ac- Size min./ min.( min./ Make-up <br /> tion—when combined with y q B Bell (in./mm) open. oper. oper. (minutes) <br /> the adhesive—promotes <br /> positive make-up of the 2 50 .5 1.5 0.3 1.0 <br /> joint and prevents Pipe-to-Couplings 3 75 .5 2.5 0.3 2.0 <br /> backout during adhe- <br /> sive curing. 4 100 .5 3.5 1.5 3.0 <br /> Pipe is supplied <br /> with T.A.B. spigot x For guidance under specific circumstances,consult your <br /> T.A.B.spigot ends. Smith Fibercast distributor or representative. <br /> Fittings are manu- <br /> factured to accept ei- Before beginning any installation,it is important that all <br /> ther a tapered spigot or crew members be familiar with the installation procedures de- <br /> T.A.B.spigot end of the scribed in this manual. It is also important that a Smith <br /> pipe. Tapers can be made in the field with tools specially de- Fibercast Red Thread®IIA Installation Checklist be reviewed <br /> signed for this purpose(see page 4). Bells cannot be field- by the crew and filled out as the job progresses. A completed <br /> made.When a belled end is needed,use a sleeve coupling. copy of the checklist should be retained to document that the <br /> RED THREAD iIA Pipe & Fittings — 2 <br />