Laserfiche WebLink
Primary Piping System Installation <br /> PIANO LAYOUT e. Bond last field joint and then first tee joint(T1). <br /> T b►IA'Pri Plitie f. Insert next length of primary pipe inside secondary pipe; <br /> push into next downstream dispenser sump as before. <br /> Below are two methods of piping layout: <br /> Step 2 <br /> Method A Bond upstream tee joint(T2)then first tee joint in sump <br /> Parallel Fiberglass Pipe Layout (T3). <br /> Installation for Method A Step 3 <br /> Bond tee joint T4,then the 80"connection. <br /> Method A a. Using the shortest practical <br /> route,run the pipe in a sm- <br /> gle trench from the tanks to <br /> ^; 2 x f'h"Threaded <br /> the vent risers. Fiberglass Tee Reducer Bushing <br /> j Dispensers b. Pipe should run parallel to <br /> the tanks and dispensers. <br /> i c. Avoid piping across the Use a fiberglass <br /> tanks. tee instead of a <br /> steel tee for more <br /> room inside the —&�� <br /> L...._41,k Tanks dispenser sump. <br /> 2"BXMi Threaded <br /> Steel Tee Adapter <br /> Method B <br /> Series Fiberglass Pipe Layout <br /> Installation for Method <br /> » <br /> Method i , <br /> stop lex Connectors <br /> a. Start installation from Flexible Sump a <br /> tank. Entry Fitting <br /> s b. Make up tee assemblies, 2 x f'h"Threaded <br /> Dispensers Containment <br /> including flex connectors. Pipe Reducer Bushing <br /> > Fiberglass or steel tees <br /> can be used, but fiber- �� .��•�,_ ._ __ � �� <br /> glass leaves more room., , w <br /> c. Insert primary pipe inside " <br /> Tanks containment. Push pipe Primary Pips ,E�►I TestlDrain Valve Fiberglass Tee= <br /> into downstream dis- 4. <br /> denser sump with sump <br /> entry fitting disassembled Fiberglass <br /> and tee pushed out of the Dispenser Sump <br /> way. NOTE: For Smith Fibercast sump entry/termination <br /> d. Position pipe for bonding last field coupling or fitting,and fittings,sumps must be free to move during <br /> assemble first sump entry fitting. I installation for insertion of primary piping. <br /> a <br /> TANKT1 T2 T3 T4 <br /> rs r � m <br /> . .�FEZ <br /> Last field joint. J <br /> Step <br /> Step <br /> 5 Installation Instructions <br />