Laserfiche WebLink
Primary Piping System Installation <br /> modulus of 1,000 psi with no compaction,while sand re- <br /> quires slight com- <br /> Proper construction of trenches is important. They should paction (85%®Proctor <br /> be wide and deep enough to accommodate the piping and density)to achieve a <br /> backfill material. See Table 5 for recommended minimum modulus of 1,000 psi. <br /> burial depths. Refer to ASTM D3839 <br /> or AWWA C950 for fur- <br /> 1. Typically,all piping should slope at least 1/8"(3 mm)per then details. <br /> foot toward the tank. Support pipe properly to prevent 4. Cover the pipe as soon Backfill nwst <br /> traps or sumps. as possible after suc- be taffwed Into <br /> 2. The piping should be separated by a distance of at least cessful testing to elimi- shaded areas. <br /> four to six inches(100 mm-150 mm). For double-wall nate the chance of dam- <br /> secondary containment piping installations,refer to Table age to the pipe,floating <br /> 12 on page 19 for proper distances. of the pipe due to flood- <br /> ing,or shifting of the line <br /> due to cave-ins. If dam- <br /> age is suspected, the <br /> I Table 5 lines should be retested. <br /> _ ! _ _ _ _ _ _ _ _ _ _ _I_ _ _ _ 5. Frozen earth will even- <br /> 4•(min.' tually thaw, leaving the YES NO <br /> +00 MMI Table pipe with insufficient <br /> I support and voids around the pipe. Take care to remove <br /> d bl frozen lumps from all backfill materials before backfilling. <br /> 1 1 Ts-{mtn.l <br /> t nm <br /> 1 1 Remember,in all cases,the pipe must be completely sur- <br /> rounded with select backfill(sand,1/8"to 3/4"pea gravel,or 118" <br /> s• to 1/2"washed crushed stone). Native backfill materials should <br /> 150 mm never be used. In all cases,there must never be voids(areas <br /> The pipe must be completely surrounded with select that do not contain backfill)under or around the pipe. Six inches <br /> backfill(sand,pea gravel or washed crushed stone). (150 mm)of the fill must be placed under the pipe as bedding <br /> material. <br /> 3. Compact backfill carefully over and around the piping sys- <br /> tem. When using tamping equipment,take care to pre- <br /> vent vibration from driving small stones into the pipe wall. <br /> The amount of compaction and the type of soil determines <br /> the soil modulus. For example,pea gravel has a typical <br /> TABLE 5.Recommended Minimum Burial Depths Based on Soil Modulus of 1,000 psi or Higher <br /> (Refer to ASTM D3839 or AWWA C950 for etho eory) <br /> Min.Amount of Sand,Pea <br /> Minimum Gravel or Washed Crushed Stone <br /> Pipe Size Burial Depth Above the Top of the Pipe <br /> (in.) (mm) Surface Condition (in.) (mm) (in.) (mm) <br /> 2 50 Unpaved 17 432 12 305 <br /> Paved,min.4"(100 mm)asphalt 12 305 8 203 <br /> Paved,min.4"(100 mm)concrete 9 229 5 127 <br /> 3 75 Unpaved 20 508 14 356 <br /> Paved,min.4"(100 mm)asphalt 13 330 9 229 <br /> Paved,min.4"(100 mm)concrete 11 279 7 178 <br /> 4 100 Unpaved 20 508 14 356 <br /> Paved,min.4"(100 mm)asphalt 14 356 10 254 <br /> Paved,min.4"(100 mm)concrete 11 279 7 178 <br /> 6 150 Unpaved 36 914 14 356 <br /> Paved,min.4"(100 mm)asphalt 24 610 10 254 <br /> Paved,min.4"(100 mm)concrete 20 508 7 178 <br /> RED THREAD IIA Pipe & Fittings 6 <br />