Laserfiche WebLink
03/02/2012 03:38 9252920074 GDF_SOLUTIONS FAX PAGE 07/15 <br /> 1% 1W IRW <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN—PAGE 1 (One forret Pa facility) <br /> TM OF AMON ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION sP1 <br /> L FACHJff INMRMATION <br /> FACILITY W g ( &Vey Ux Only) — <br /> SUSINBSS NAME(Same as FACILITY NAME) RM <br /> Country Club 76 <br /> 8US24ESS SITE ADDRESS R03. I CITY Ra. <br /> 2575 Country Club Blvd. Stockton <br /> II. STILI. CONTROL AND CLEANUP METHODS <br /> This plan aftaw uniadbortzed releases from UST systems and supplements the emergency response plains and procedures in the facility's Hazardous Materials <br /> Busine"Plan. <br /> D If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g,activate pump shut-of,etc.)Mrd,if necessary.safely rave <br /> re mainh g hazardous material f nm the UST system. <br /> > Ary rel a to secondary cone n hent will be pumped or otherwise removed within a time consistent with the ability of the secondary oonuionent system to <br /> omtsin the haze is material,but root greater than 30 calw►dar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their amended use.will be managed as hazardous waste. <br /> Absorbent material will be used to contain and cleat up manageable spills of hazardous materials. Absorbent material may be reused until k bwomes too saturated <br /> to be effective, It will then be managed properly.Used absorbent material,reusable or waste,will be stoned In a properly labeled and seated.cmw . <br /> > Facility personnel will determine whether or not any water removed Brom secondary containment systems,or from clan-up activity,has been in contact with any <br /> hazardous material. If the water is coniaminmd, it Will be managed as hazardous waste. If the water has a petroleum sheen (i.e., rainbow colors). it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or noel-hazardous)from sumps.spill containers.etc, <br /> will not be disposed to storm water systems. <br /> A We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> t. Hazardous material in contact with secondary containment is not compatible with the material used for secondary corualnment; <br /> I Secondary containment is prone to damage from any equipment toned to remove or clean up hazardous material collected in secondary ountaimnent <br /> 3, Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released produo9wasic,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-YIP EQUHWEN'T <br /> PERIODIC MARMNANC&Spill control and clean-up c quipmout kept permanontly on-site is listed in the fAdlity's Hazardm Materials Business FIco. This <br /> equipment is inspedW at least monthly,and after each use,and supplies aro replenished as needed. Defective cquipnnont is repaired or replaced as <br /> IE VIPMENT NOT PERMAMMMY ON-SITE..BUT AVAHARLE FOR USE IFN DED: LCOMIcte oil if )Lmb s <br /> EQMPKM LOCATION AVAILABILITY <br /> Spill]Kit/Absorbent R10' SeMea Bay Storervom Available at all times <br /> R11, Ria. R31. <br /> R12, RU. M <br /> RI3 R23 R33 <br /> Rn4. R24 U4. <br /> WS, a" R33 <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)MARX RESPONSIBLE FOR AUTHORIZING ANY WORK NEC SSARY UNDER THIS RESPONSE PLAN: <br /> NAME dao. TrtLE Rao. <br /> Dave Elinds Sales Man Lr <br /> NAME R41• TrME Rss <br /> Mike Ahmadi DWer <br /> NAME Raz TI'I'LS Raz <br /> NAME R43, TTPI.ti am <br /> V. MONHORING INDICATORS <br /> IF MOWrr*ItING WDICATBS A POSSIBLE UNAUTHORIZED R EL>~ASF.,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> [l Additional system besting or data collection ®Inspection by qualified persons ❑Recalibration of equipment <br /> ❑Oder: <br /> UST Response Plan(3/M)313 <br />