My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2575
>
2300 - Underground Storage Tank Program
>
PR0231070
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2023 4:20:12 PM
Creation date
6/3/2020 9:43:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231070
PE
2351
FACILITY_ID
FA0006439
FACILITY_NAME
COUNTRY CLUB MOBIL CIRCLE K
STREET_NUMBER
2575
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2575 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231070_2575 COUNTRY CLUB_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/17/2009 14:37 9259790467 CFSI PAGE 02/05 <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN—PAGE I One formf acilitvl <br /> TYPE OF ACTION 1.NEW PLAN C3 2.CHANGE OF INFORMATION ROI. <br /> FACILITY I D# (Agency Use Only) r. <br /> 1. FACILITY MORMATION " . <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> Coun" Club 76 <br /> BUSINESS SITE ADDRESS 11n. BUSINESS SITE CITY <br /> 2576 Cougtg Club Blvd Stockton <br /> 11. SPILL CONTROL AND CLEATfEJP'MMTHODS <br /> This plan addrmscs unauthorized releases fmm UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> > If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,,if nocemary,safely remove <br /> remaining hazardous material from the UST system. <br /> P, Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment sy.stan to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as,hazardous waste, <br /> > Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as lia=rdous waste unless a waste determination in accordance with 22 CCR 466262,11 finds that <br /> it is non-hazardous. TJ$cd absorbent material,rctisshic or waste.will be stored in a properly labeled and g—calgI contains. Waste material shall be disposed of <br /> appropriately, <br /> > Facility personnel will determine whether any water removed from secondary containment systems,or from dean-up activity, has been in contact with any <br /> hazardous material, If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> 466262.11 rinds that it is non-hazardous, if the water has a petroleum sheen(i,c,.rainbow colors).it is contaminated, A thick flontrig petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-ha ardour)From sump.-;,spill containers,etc.will not be disposed to storm water systems. <br /> > We will review secondary containment system for possible deterioration if any of the following conditions occur; <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment <br /> 2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazaTilate.;material collected in secondary containment; <br /> 3. Hazardous material,other than the pmducvwsqtc stored in the primary containment spriern, is placed inside secondary containment to treat Or nCUtrRli7.0 <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLtAN-VP.EQ UIPN[ENT <br /> PERIODIC MAINTENANCE*Spill control and cican-up,equipment kept permanently cm-sitc is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies arc replenished as needed. Defective equipment is repaired or replaced as necessary, <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVA ILA HLE FOR USE IF NEEDED: (C® Ielq en iftamficahle) <br /> EQUIPMENT LOCATION AVARABIL)ITY <br /> Rio. RM. FUQ. <br /> R11. R9,1. "I. <br /> Ri2. 1122. R32. <br /> It.13. P23. R31 <br /> R14. R24, IU4. <br /> R15. R25. 105. <br /> IV. RESPONSIBLE PERS014S <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSTBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME P40 TITLE Rio, <br /> Avatar Manager <br /> NAME K41, TITLE R31, <br /> Dave Hinds Sales Manager <br /> NAME A42. TIT1,1F. R252. <br /> Dave Hoover Vice Pmeldent <br /> NAME R43. TITLE <br /> V. MONMRING MICATORS'' <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL 13E MADE AS FOLLOWS: <br /> 17 1. ADDITIONAL,,YSTI;m TrisTrNo OR DATA COLLECTION 0 2. INSPECTION BY OUALIPND PERSONS C3 3. RECALIBRATfON OF FQIJIPMFW Roo. <br /> 99. OTHER(Spocify)! <br /> UN-1122B-113 Rev. 04/02/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.