My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_2007-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 10:36:46 AM
Creation date
6/3/2020 9:43:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2008
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_2007-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />HydroGuardTM System Warranty Standard Features: <br />The HydroGuardTM System Warranty is unmatched in <br />the industry. CSI tanks and turbine enclosures carry • UL -Listed Double -Wall Tank <br />and Turbine Enclosure System <br />a 30 -year structural and corrosion warranty. Visit <br />ito e <br />our web site at www.containmentsolutions.com for k <br />I <br />a complete HydroGuardTM System Warranty. <br />—Independent Third Party <br />Tested <br />Lower Operating Costs Over <br />UST System Lifetime <br />-Lower Total Costs / Short <br />Lead Times / Reduces Job <br />Site Coordination Time <br />-Lower Total System Cost / <br />Simplified Bidding <br />7. <br />• Primary Tank Openings and <br />Specification <br />Critical Tank Top Equipment <br />Short Form: <br />is Accessible <br />e: <br />The contractor shall provide the HydroGuardTM <br />System, <br />System, which includes double-wall fiberglass <br />ops to an n <br />trr <br />underground storage tanks and turbine enclosures, <br />• Standard Products <br />UL -Listed as shown on the drawings. Tanks and <br />turbine enclosures will be equipped with high <br />�4 <br />�9 <br />contrast brine monitoring fluid in the annular space. <br />h� <br />a a.ranty <br />The HydroGuardTM System shall be manufactured <br />• One Price Approach <br />by Containment Solutions, Inc. The HydroGuardTM <br />System shall be installed according to the current. <br />a e t�porttgfit` <br />>r <br />installation instructions (Pub. No. INST 6001 and <br />, <br />t u the ciosue Li <br />INST 6034) provided in the shipping packet. <br />—Independent Third Party <br />Tested <br />Lower Operating Costs Over <br />UST System Lifetime <br />-Lower Total Costs / Short <br />Lead Times / Reduces Job <br />Site Coordination Time <br />-Lower Total System Cost / <br />Simplified Bidding <br />7. <br />
The URL can be used to link to this page
Your browser does not support the video tag.