My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FAIRMONT
>
975
>
2300 - Underground Storage Tank Program
>
PR0231331
>
COMPLIANCE INFO_2007-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 10:36:46 AM
Creation date
6/3/2020 9:43:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2008
RECORD_ID
PR0231331
PE
2351
FACILITY_ID
FA0000513
FACILITY_NAME
LODI MEMORIAL HOSPITAL
STREET_NUMBER
975
Direction
S
STREET_NAME
FAIRMONT
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03107039
CURRENT_STATUS
01
SITE_LOCATION
975 S FAIRMONT AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231331_975 S FAIRMONT_2007-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7ressure Ratings,, Minthum Bending Radius <br />SMARTFLEX has been optimized for use in buried applications and for the <br />transportation of the following fuels: <br />• Gasoline <br />• Unleaded gasoline <br />• Methanol <br />• Ethanol <br />• Kerosene <br />• Alcohol fuels <br />• Diesel fuels <br />• Aviation fuels <br />1" (32 mm) 116 psi (8 bar) 56 psi (4 bar) 23" (58 cm) <br />(50 mm) 116 psi (8 bar) 56 psi (4 bar) 35" (90 cm) <br />2" (63 mm) 116 psi (8 bar) 56 psi (4 bar) 45" 010 cm) <br />3" <br />(90 -mm) 116 psi (8 bar) 56 psi (4 bar) 64" (160,cm) <br />4" 010 mm) 116 psi (8 bar) 56 psi (4 bar) 78" (200 cm) <br />WARNING: for fuels or operating conditions other than those listed above, <br />contact NUPI Customer Service for further advice. <br />The SMARTFLEX piping system comes with a 30 years raw materials and <br />workmanship warranty. In order for the product warranty to be valid, <br />SMARTFLEX must be installed by factory certified installers in accordance <br />with the latest technical instructions. 4. <br />The warranty is validated only by providing NUPI with the following items: <br />• Warranty Certification Form, <br />• Welding Report, <br />• Pressure Test Report. <br />Above items may be sent via E-mail or the Interactive Tracking System (ITS) <br />to: <br />Certification/Warranty Administrator <br />NUPI Industrial Division <br />Via Colombarotto, 58 <br />40026 Imola (BO) <br />ITALY <br />E-mail: infoid o,nupinet.com <br />ITS:'hap.-Ilits.nunin m <br />Aandling SMARTFLEX Pipes and Fittings <br />Transporting <br />Use reasonable care in handling the pipe and fittings. When transporting <br />from storage to the job site, do not allow pipe to extend more than 3 feet <br />(1 m) beyond the end of the truck pipe rack or trailer bed. Note: During <br />transport, strap the pipe down with nylon or hemp rope tie downs. This will <br />help prevent abnormal movement of the pipe during transportation. Wood <br />or padded supports are essential for truck or trailer beds that have sharp <br />edges (such as metal plates on the back of a flat-bed trailer). <br />26 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.