My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Prior to tank lining, a site assessment must be performed under the direction of Public Health Services <br /> environmental Health Division (PHS-EHD), site mitigation unit. <br /> Site Assessment has been performed under PHS-EHD direction <br /> r— <br /> Site Assessment has not been performed under PHS-EHD direction. Please contact PHS-EHD site <br /> Migation unit at(209)468-3449 <br /> 2. Reason tanks will be interior lined/repaired: <br /> Meet State/Federal upgrade requirements (submit PHS-EHD UST upgrade permit application with <br /> this application) <br /> Tank system failure, please describe: <br /> \ <br /> ,c i� c r <br /> 3. The following tests are required to be performed prior to lining to determine the structural integrity of the <br /> U! <br /> Steel tanks <br /> Ultrasound Test(Note: The UST shall be closed in accordance with Article 7 Title 23 CCR if the <br /> tank's average metal thickness is less than 75 percent of the original wall thickness of if the tank <br /> has any of the listed defects in Article 6, Title 23 CCR section 2663 (b) (2) (B)) <br /> Certification by a"Special Inspector"that the tank is structurally sound for tank lining and continued <br /> use: <br /> a. sandblast to white metal <br /> b. count number of holes, splits, perforations, and other defects <br /> ;�.... it result to EHD <br /> on-st <br /> N <br /> eel tanks, fiberglass <br /> �-------_.m__-.___-----.... <br /> Certification by a"Special Inspector"that the tank is suitable for lining. <br /> _a. interior walls cleaned by wipe down <br /> s b. interior diameter measurements <br /> _c. visual check for structural, tension, or compression problems <br />
The URL can be used to link to this page
Your browser does not support the video tag.