My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Corrosion protection system <br /> Please describe the type of corrosion protection system you propose to install. The cathodic protection <br /> system retrofitted on existing UST systems must be designed by a corrosion specialist certified by the <br /> National Association of Corrosion Engineers (NACE) or by a qualified professional engineer. Metal <br /> components of the UST system (i.e. submersible pumps, piping etc) that routinely contain fuel and are in <br /> contact with the ground must also be catholically protected. <br /> 5. Certification: (Application will be disapproved without this information) <br /> Attach detailed information as to the methods used to line the tank and a certification from the manufacturer, <br /> or his authorized representative, of the tank lining material's capability to store the proposed hazardous <br /> substances. <br /> 6. Describe the monitoring performance standard you propose to use after the lining/ repair is complete. <br /> c� re-4�tSW^ v� �n� cfL\ <br /> r t � <br /> 7. a. Describe how the hazardous waste generated from the tank lining/repair will be managed on site. <br /> (Note: all hazardous waste stored on site must be managed in accordance with Title 22 California <br /> Code of Regulations (CCR)). q (\ <br /> '-I <br /> �1etxOn`b C�r� �aCDCak-eco �. C.f+�.0 <6i ®c\C.® <br /> b. Identify the contractor performing the UST decontamination: <br /> Name rackcne, tv®c Phone:-s`a v3s7 <br /> Address V%, c City k-,L.�bra zip Qti�t <br /> C. Residual Fuel Hauler: <br /> Company Name O�Rko moo _Phone: L?tql <br /> Address City zip ggQf l <br /> Transporter's ID# <br />
The URL can be used to link to this page
Your browser does not support the video tag.