My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB 05 '99 14:43 FR CONTAINMENT SOLUTIONS814 542 5020 TO 9-15108958426 P.10i20 <br /> section Safamc <br /> bulletin 3 <br /> date —„2/l/91 <br /> page 33 of 6-- <br /> The safety observer is not to enter the tank for rescue if the man can gat <br /> out himself. <br /> If physical rescue is required, the safety observer is to: <br /> A. Surmon the backup man (sound air horn if necessary) . DO NOT ENTER <br /> the tank without back-up present. <br /> B. Attempt to pull the technician toward the entry hole by means of <br /> the lifeline. <br /> _C.. Attach lifeline to safety harness. <br /> D. Put on the SCBA and test operation. <br /> E. Enter the tank and assist in the rescue and removal of the man, <br /> after the stand-by person is present at the tank entry hole. <br /> 2. Remove All Possible ZXgAuct <br /> Use a hand pump or approved flammable fluid pump to remove as much <br /> product as possible. No more than 1” of product should be in the tank <br /> prior to ventilation. Remove submersible pump if it is accessible. <br /> 3. Start Ventilation <br /> Connect an approved air mover to exhaust air from the fill pipe or <br /> other pipe or hose within 12" of tank bottom. The air mover must be <br /> grounded when in use. Extend exit point of exhaust at least 61 above <br /> grade. <br /> Continue to ventilate until test with the combustible gas meter <br /> indicates the LEL is less than 10% within 12" of tank bottom. Remove <br /> fill pipe to check. This can take between 2 and 24 hours depending on <br /> the amount of product left in the tank. <br /> If tank lines are manifolded, the line to the tank to be entered might <br /> have to be broken and blanked off to isolate the tank and allow <br /> defuming of the tank. <br /> 4. Cut Entry Hole <br /> Cut entry hole only after tests confirm the vapor level within 12" <br /> of the tank bottom is less than 20% of the LEL. Use only an air <br /> powered saw. The minimum hole size to facilitate rescue if required is <br /> ( 24" x 24". <br />
The URL can be used to link to this page
Your browser does not support the video tag.