Laserfiche WebLink
FEB 05 '99 14:44 FR CONTAINMENT SOLUTIONS814 542 5020 TO 9-15108958426 P.11/20 <br /> section SafetyAd <br /> s bulletin 3 <br /> date2/1191 <br /> page 4 0 6 <br /> 5. Tests Befora Eaterins <br /> After the entry hole is cut, check the vapor level and 02 level through <br /> the entry hole. <br /> Minim=. entry requirements are; <br /> vapor level less than 10% LEI. <br /> 02 level greater than 19.5X <br /> 6. Confined Space Entry Permit <br /> Complete the attached Confined Space Entry Permit and post near the <br /> entry hole in clear view. <br /> 7. Initial Enter <br /> When the above entry requirements are met, entry may be made with the <br /> use of an air-supplied mask and an Egress air cylinder. <br /> At the first entry of the day, take the meter into the tank and check <br /> for hot spots. if the 02 is less than 19.5% or the vapor level exceeds <br /> 10% LEL, exit the tank and continue ventilating. 4 <br /> Remove any residual product with an approved pumping system or by <br /> manual means. Ary the area with rags or "oil dry" material and have <br /> the contractor dispose of it in a safe place. <br /> Plug internal openings after the initial air check. <br /> A. Manifolded vent lines may be plugged with an expandable plug or by <br /> forcing the ball of a check valve arrangement up tight against the <br /> fitting with wood. _ <br /> B. Submerged pumps, if not removed, are to be capped at the bottom. <br /> The return line is to be plugged with a cork. <br /> C. Suction and siphon lines are to be capped or enclosed in plastic to <br /> prevent drips. <br />