My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB 05 '99 14:44 FR CONTAINMENT SOLUTIONS814 542 5020 TO 9-15108958426 P.11/20 <br /> section SafetyAd <br /> s bulletin 3 <br /> date2/1191 <br /> page 4 0 6 <br /> 5. Tests Befora Eaterins <br /> After the entry hole is cut, check the vapor level and 02 level through <br /> the entry hole. <br /> Minim=. entry requirements are; <br /> vapor level less than 10% LEI. <br /> 02 level greater than 19.5X <br /> 6. Confined Space Entry Permit <br /> Complete the attached Confined Space Entry Permit and post near the <br /> entry hole in clear view. <br /> 7. Initial Enter <br /> When the above entry requirements are met, entry may be made with the <br /> use of an air-supplied mask and an Egress air cylinder. <br /> At the first entry of the day, take the meter into the tank and check <br /> for hot spots. if the 02 is less than 19.5% or the vapor level exceeds <br /> 10% LEL, exit the tank and continue ventilating. 4 <br /> Remove any residual product with an approved pumping system or by <br /> manual means. Ary the area with rags or "oil dry" material and have <br /> the contractor dispose of it in a safe place. <br /> Plug internal openings after the initial air check. <br /> A. Manifolded vent lines may be plugged with an expandable plug or by <br /> forcing the ball of a check valve arrangement up tight against the <br /> fitting with wood. _ <br /> B. Submerged pumps, if not removed, are to be capped at the bottom. <br /> The return line is to be plugged with a cork. <br /> C. Suction and siphon lines are to be capped or enclosed in plastic to <br /> prevent drips. <br />
The URL can be used to link to this page
Your browser does not support the video tag.