My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_1996-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 11:00:44 AM
Creation date
6/3/2020 9:44:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996-1999
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_1996-1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB 05 °99 14:44 FR CONTAINMENT SOLUTIONS814 542 5020 TO 9-15108958426 P.12/20 <br /> section Safety <br /> bulletin 3 <br /> date 2ZJZ21 <br /> page 5 0£ 5 <br /> 8. Continuous Monitoring <br /> Vapor level and C2 level must be monitored continuously, either through <br /> the entry hole or down the exhauster with the probe (at least 12" below <br /> the exhauster into the fill, pipe) . Readings above 20% LEL or less than <br /> 19.5% 02 require work to cease, and technician to exit the tank, and an <br /> investigation as to the source with subsequent correction. <br /> 9. Inspection <br /> data on appropriate sheet. <br /> 10. Re e <br /> If an agreement is reached and the tank is to be repaired, proceed as <br /> follows: <br /> A. The tank must be mechanically ventilated at all times. <br /> B. Complete the Confined Space Entry Permit and post at each tank <br /> entry hole. (Note: A neer Confined Space Entry permit is required <br /> for each day's entry.) <br /> C. Instruct the safety observer of his duties And emergency <br /> procedures. <br /> D. A safety harness with lifelines is required for hot tank entry. <br /> E. Use of an air-supplied mask and Egress air cylinder required unless <br /> absolutely certain tank never had proi3uct in. it. If an air-fed <br /> ma k is not used: <br /> 1) During grinding, goggles or a hood and an approved organic <br /> respirator are to be worn. <br /> 2) During iayup work, or at a= time resin is in the tank, goggles <br /> and an approved organic respirator or a fresh air mask must be <br /> worn. <br />
The URL can be used to link to this page
Your browser does not support the video tag.