Laserfiche WebLink
► Page - of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard O Professional Engineer <br /> O Other(Specify) <br /> Test Method Used: ®Pressure ❑ Vacuum El Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: DIAL GAUGE Equipment Resolution:0 to 15"psi <br /> NONIOW <br /> ng Run# Piping Run# Piping Run# Piping Run# <br /> rPipingMaterial: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: <br /> Initial Reading.(RD: 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: <br /> Final Reading(RF): PSI PSI PSI PSI <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-Rt): PSI PSI PSI PSI <br /> Pass/Fail Threshold or Zero Zero Zero Zero <br /> Criteria: <br /> _- <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> At <br /> ®> <br /> d <br /> Arco#2133 <br /> 2908 W. Benjamin Holt Dr. <br /> Stockton, CA. 95207 <br /> N05127 — SB 989 Testing <br />