Laserfiche WebLink
T Page 3 of <br /> 6. PIPING SUMP TESTING 0 <br /> Test Method Developed By: 0 Sump Manufacturer ID Industry Standard 0 Professional Engineer <br /> [I Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Wayne Perry Inc. Equipment Resolution: .0007" <br /> Sump# -7 o z olj Sump# Sump# �'� F_ Sump# <br /> Sump Diameter: <br /> Sump Depth: 3? <br /> Sump Material: , <br /> Height from Tank Top to Top of » <br /> Hi hest Piping Penetration: v!� & 3c> <br /> Height from Tank Top to Lowest » <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sum Tested 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST <br /> Sump PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION <br /> Does turbine shut down when <br /> sump sensor detects liquid(both 0 Yes 0 No 0 NA 0 Yes 0 No ®NA 0 Yes 0 No ®NA 0 Yes 0 No 0 NA <br /> product and water)?' <br /> Turbine shutdown response time NA NA NA <br /> Is system programmed for fail-safe 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> shutdown?` <br /> Was fail-safe verified to be 0 Yes DNo 0 NA 0 Yes ONo 0 NA 0 Yes []No 0 NA 0 Yes 0 No 0 NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> test: <br /> Test Start Time: T: <br /> Initial Reading(RD: 96S S/06 <br /> Test End Time: q': Z>Z ";',-1,9 <br /> Final Reading(RF): 9. 9--g'?' /VC,197 <br /> Test Duration: 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min <br /> Change in Reading(RF-RJ: -v oo yy ,0000 <br /> Pass/Fail Threshold or Criteria: -0.0020 0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> c <br /> .... ._x.. <br /> Was sensor removed for testing? ®Yes 0'No 0 NA go Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> Was sensor properly replaced and ®Yes 0 No 0 NA ®Yes 0 No 0 NA 0 Yes 0 No 0 NA0 Yes 0 No 0 NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> a " <br /> t 7' J~�c.tra►���� �Ci/[.� ��,e+�P — <br /> Arco #2133 <br /> 2908 W. Benjamin Holt Dr. <br /> Stockton, CA. 95207 <br /> N05127— SB 989 Testing <br />