Laserfiche WebLink
I-it- I ri t-L-UUM rmuL ut <br /> SAMPLING PROTOCOL FOR ROUTINE PIPING/DISPENSER REMOVALIREPLACEMENT <br /> The following represents minimum sampling criterion required for closure compliance- soil samples collected shall b( <br /> representative of native soils beneath the tank's invert (tank's bottom) at a collection depth not to exceed 2 - 4 feet, I <br /> contamination is documented during closure, an Unauthorized Release Notification must be completed and submitted withjr <br /> five(5)working days pursuant to California Health&Safety Code,Section 25295. <br /> DISPENSER SAMPLES <br /> AT LEAST ONE SAMPLE BELOW EACH DISPENSER <br /> PIPING AND STOCKPILE <br /> PIPING SOIL SAMPLES 1 Sample every 20[in"feet <br /> DISPENSER&PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> 4 <br />