My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2006-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 1:10:36 PM
Creation date
6/3/2020 9:44:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2007
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2006-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19255517888 Main Fax GETTLER RYAN INC 04:42:26 p.m. 11-30-2007 4/4 <br /> F. In-Tank Gauging/SIR Equipment: A Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SiR equipment is installed. <br /> This section must be ratnpleted it in-tank =aut;in t ui trent is use t <br /> Comptete the foil owin checklist: <br /> I❑ Yes ❑ No:' Has all input wiring been inspected tin•proper entry and termination,including testing for ground faults'? <br /> ❑ Yes L3 No* Were all tank gauging probes visually inspected for damage and residue buildup! <br /> ❑ Yes El No" Was accuracy of system product level readings tested'? <br /> ❑ Yes ❑ NO Was accuracy of system water level readings tested'? <br /> ❑ Yes ❑ NO Were all probes reinstalled properly? <br /> ❑ <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed'? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Lane Leak Detectors(LLD): ® Check this box if LLDs are not installed. <br /> Cum tete the foliowin checklist: <br /> ❑ Yes 0 No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance'? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 0 3 g.p.h.; ❑0.1 g.p.h-, 0 0.2 g.p.h. <br /> ❑ Yes <br /> El Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated'? <br /> ❑ Yes ❑ NO For mechanical LLDs,does the LLD restrict product Flaw if it detects a leak" <br /> ❑ N/A <br /> ❑ Yes ❑ NO For electronic LLDs.does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> 0 Ycs ❑ No* For electronic LLDs.does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑ Yes 1 D No` Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: __ 4 t/1 0 J caSfi (eL Os -I-►tis <br /> moo <br /> Page 3 of 3 n�mt <br />
The URL can be used to link to this page
Your browser does not support the video tag.