My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2006-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 1:10:36 PM
Creation date
6/3/2020 9:44:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2007
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2006-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AVIL <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION N 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mol. <br /> PLAN TYPE N MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. M02. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> . ..,,: I FACILITT�INEORIVIATION <br /> FACILITY ID#(Agency Use Only) <br /> FACILITY NAME ARCO#02133 M03. <br /> FACILITY SITE ADDRESS 2908 BENJAMIN HOLT DRIVE M04. CITY STOCKTON Mos. <br /> : . <br /> II EQUIPMENT TESTING AND PREVENTIVE 1VYATNTENANGE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED N 1.ANNUALLY ❑ 99.OTHER(Specify): Mol. <br /> IIL MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> ICV. TANK MONITORING <br /> _. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M10. <br /> N 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M11. <br /> PANEL MANUFACTURER: Veeder Root M12 MODEL#: TLS 350 M13. <br /> LEAK SENSOR MANUFACTURER: Veeder Root M14. MODEL#(S): 794390-420 MIS. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16 MODEL#: MIT <br /> IN-TANK PROBE MANUFACTURER: Mla. MODEL#(S): M19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M20 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHER(Specify): M22. M23. <br /> g•P• g•P• ( P fY)� <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25 <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): M26. M27. <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> ❑ 99.OTHER(Specify): M28' <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Mao. <br /> N 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: N a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M31. <br /> PANEL MANUFACTURER: Veeder Root M32. MODEL#: TLS 350 M33. <br /> LEAK SENSOR MANUFACTURER: Veeder Root M34 MODEL#(S): 734380-208 M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? N a.YES ❑ b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? N a.YES ❑ b.NO M37. <br /> N 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s): VAPORLESS Mas MODEL#(S): LD 2000(91) M39. <br /> N 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: VEEDER ROOT Moo. MODEL#: PLLD(87) M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? N a.YES ❑ b.NO M43, <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? N a.YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46. <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED** M47. <br /> •Requires agency approval **Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25281.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99.OTHER(Specify) Mas. <br /> Arco#02133, Belshire Environmental Services Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.