My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2006-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 1:10:36 PM
Creation date
6/3/2020 9:44:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2007
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231021_2908 W BENJAMIN HOLT_2006-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k P'. <br /> UNDERGROUND STORAGE TANK 41 <br /> MONITORING PLAN- PAGE 2 <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M50. <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: Veeder Root Ms1. MODEL#: TLS 350 M52. <br /> LEAK SENSOR MANUFACTURER: Veeder Root M53. MODEL#(S): 794380-208 M54. <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ® a.YES ❑ b.NO M55. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO M56. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO M57. <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: M"- MODEL#(S): M59. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) Mho. <br /> ❑ 4.NO DISPENSERS <br /> ❑ <br /> 99.OTHER(Specify) M61. <br /> VII'. ENHANCED LEAK DETECTION <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) Mso. <br /> 1. ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)* <br /> 3. ® THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of MM/DD/YY) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99. ❑ OTHER(Specify): Mal. <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br /> By 1/l/2005,this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(ICC). By July 1, <br /> 2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems.This training <br /> will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after July 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. !COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Mss. <br /> *Monitoring systems manual maintained by contracted,licensed pump and tank technicians. <br /> Best Management Practices are maintained in the H.S.S.E.Retail Facility Programs Manual(Green Binder). <br /> *Tank Overfill Protection Type: Visible and Audible alarm at tank fill point(s)and operates alarm trigger at 90%. <br /> X. PERSONNEL-RESPONSIBILITIES <br /> THE FACILITY OPERATOR DESIGNATED IN SECTION XI BELOW IS RESPONSIBLE FOR PEFORMING MONITORING. BP WEST COAST PRODUCTS <br /> LLC IS RESPONSIBLE FOR MAINTAINING AND TESTING ALL MONITORING EQUIPMENT. <br /> M. OWNER/OPERATOR SIGNATURE <br /> ....... ... <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> OWNER/OPERATOR SIGNATURE REPRESENTING DATE: M91. <br /> ❑Owner M9o. <br /> ////,?—/CD® // <br /> .-- Operator / <br /> OWNER/OPERATOR NAE(print): M92. OWNER/OPERATOR TITLE: M93. <br /> M <br /> LAURENCE ALLAN WIGHT DEALER <br /> (Agency Use Only) This plan has been reviewed and: Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: <br /> Comments/Special Conditions: <br /> Arco#02133,Belshire Environmental Services Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.