My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1856
>
2300 - Underground Storage Tank Program
>
PR0231069
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2023 11:45:51 AM
Creation date
6/3/2020 9:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0231069
PE
2361
FACILITY_ID
FA0001909
FACILITY_NAME
STOP N SHOP
STREET_NUMBER
1856
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
123-191-02
CURRENT_STATUS
01
SITE_LOCATION
1856 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231069_1856 W COUNTRY CLUB_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- (Page I ®f 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN "z 2.CHANGE OF INFORMATION ago 1. <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2- <br /> (Check <br /> 90-2(Check one item only) n 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFOTION <br /> FACILITY_1D#(Agency Use-Only) RMA <br /> BUSINESS NAME(Same as Facility Vain or DBA) <br /> BUSINESS TE ADDRESS FJ'A j� - H'ii 6 ' <br /> j kv4 t03 1 CITY 104, <br /> I. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specific <br /> by the equipment manufacturers'instructions,or annually,._whichever is more frequent,Such_work must beperformedby qualified personnel.[23 CCR§2632,2614,2638,26411 <br /> 490-3a. <br /> MONITORING EQUIPMENT IS SERVICED 'WI.ANNUALLY ❑ 99.OTHER(Specify): 490.3b. <br /> 111. MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN El 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR§2632,2634, 490-4. <br /> (Check all <br /> IV. TANK MOthat apply) <br /> NITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> 1K I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5 <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR§2632,26341 <br /> SECONDARY CONTAINMENT IS: %a.DRY El b.LIQUID FILLED ❑ c,PRESSURIZED El d.UNDER VACUUM 410-6. <br /> PANEL MANUFACTURER: C'm!atec 490-7, MODEL 9: _CUL 3 C&C' 490-8. <br /> LEAK SENSOR MANUFACTURER: i�mntpc_ 490-9, MODEL 4(S):CUT <br /> S 490-10. <br /> ❑ 1 2.AUTOMATIC I I TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL tA&KIS).[23 CCR§26431 490-11. <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL 4(S): 490-15. <br /> LEAK TEST FREQUENCY: El a.CONTINUOUS ffi7b DAILY/NIGHTLY ❑ c.WEEKLY 490-16, <br /> ❑ d.MONTHLY El e.OTHER(Specify): 490-17. <br /> 490-18, <br /> PROGRAMMED TESTS: El a.0.1 g.p.h. ❑ b.0.2 g.p.h. El c.OTHER(Specify): 4907.19_ <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23CCR§2646 1] 490-20❑ <br /> 490-21. <br /> 4.WEEKLY MAN-UAL TANK GAUGING(MTG)123 CCR§26451 TESTING PERIOD: 0 a.36 HOURS [Ib.60 HOURS 490-22, <br /> El 5.TANK INTEGRITY TESTING PER[23 CCR§2643.11 490-23 <br /> 490-24, <br /> TEST FREQUENCY: El a.ANNUALLY [:1 b.BIENNIALLY F-1 c.OTHER(Specify): 490-25. <br /> _ 490.26. <br /> E3 99.OTHER(Specify): 490-27, <br /> (Cl <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) thahect ak pplaly) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS 490-28. <br /> [21 CCR SECONDARY CONTAINMENT IS: �a.DRY [I b.LIQUID FILLED 0 c.PRESSURIZED [I d.UNDER VACUUM 490-29, <br /> §26361 PANEL MANUFACTURER: Cro yAi`c 490-30. MODEL#: LEL'EUCS 1 490-31. <br /> LEAK SENSOR MANUFACTURER: nrnntec 4910-32, MODEL#(S): I=f-5; 490-33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUNT(i.e.,TURBINE)SHUTDOWN. jEr a.YES 0 K NO 11-14. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES [Ib.No 490,35, <br /> K MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.(23 CCR§26361 490-37. 490-38, <br /> MLLDMANUFACTURER(S): k-��I <br /> lAIC�krL MODEL#(S): V <br /> F1 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.t23 CCR§26361 490-39. <br /> ELLD MANUFACTURER(S): 49040, MODEL#(S): 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: El a.MINIMUM MONTHLY 0.2 g.p.h. [I b.MINIMUM ANNUAL 0.1 g.p.h. 49042. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. E] a.YES [I b.No 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. El a.YES [I b.NO 190-44 <br /> ❑ 4.PIPE INTEGRITY TESTING. 49045. <br /> 490-46. <br /> TEST FREQUENCY: rl a.ANNUALLY 0 b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49047 <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48. <br /> FREQUENCY: ❑ a.DAILY [I b.WEEKLY El c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049. <br /> .Allowed for monitoring oi�.jkoqd crnqi;eRcy.s9!!q4torf--1 piping <br /> ---------_ <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR§2636(aX3)) 490-50. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51, <br /> 4W-52. <br /> ❑ 99.OTHER(Specify) 490-53. <br /> UPCF UST-D(12/2007)-1/4 www.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.