Laserfiche WebLink
002188 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VL UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THF FOLLOWING METHOD 490-5a9asab 0-5 <br /> WY <br /> h <br /> ❑ 1 CONTINUOUS ELECTRONIC MONITORING 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS 1199 OTHER(Specify): <br /> 490 990' <br /> PANEL MANUFACTURER '55 MODEL# <br /> LEAK SENSOR MANUFACTURER 490 Sr MOREL#(S): 0-90 ss <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES Mb.NO 490.59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES1b. <br /> b.NO 490'6° <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AL70MATIC PUMP SHUTDOWN C3a.YES NO 490.61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER Q a.YESb.NO 49062 <br /> 2.UDC CONSTRUCTION IS K.SINGLE-WALLED 1:12.DOUBLE-WALLED 490-63 <br /> I <br /> IF DOUBLE WALLED: 490l4a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: 0 1.LIQUID 0 2.PRESSURE 0 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 49-646 <br /> VII.PERIODIC SYSTEM TESTING <br /> 1. ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49°0-5. <br /> :AK DETECMN QM MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br /> 2 SECONDARY CONTAI41Y OT COMPONENTS ARE TESTED EVERY 36 MONTHS. q90-66 <br /> jq 3.SPILL BUCKETS ARE TESTED ANNUALLY 490.67 <br /> 4 <br /> VIIL RECORDKEEPING <br /> The <br /> following monitoring/ termntce records aro kept for this facility: <br /> Aharm logs 490.60-0- Visual Inspection Records 490.66b 8nk integrity testing results 49"k <br /> SIR testing results(mrd supporting documentation records). 490-bsa Tank gauging results(and supporting documentation records). 490-6U <br /> TG Testing results(and supporting documentation records).490.6tf Corrosion Protaction 60-day logs 490-6% <br /> Equipment maintenance and calibration records. 49D-m <br /> IX.TRAE%NG ) <br /> T <br /> l with UST monitoring responsibilities aro familiarmvi*�n all ofthe following documents relevant to their job duties. 4w"% <br /> CE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> S UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490.69eRATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69e <br /> IFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.6% <br /> ❑ STATE WATER RESOURCES CONTROL BOARD(SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490.69r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490.699 <br /> ❑ OTHER(Specify):m6w MWi <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> i <br /> "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> • Operation of tho UST systems in a manner consistent with the facility's best management practices <br /> • The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan I <br /> • The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> • Nantes of comact person(s)for emergencies and monitoring almma.490-7 <br /> X. CONOMTS(ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.496-7n <br /> Llr <br /> M.PERSONNEL tt MNSIBRJTIES <br /> The UST Owner/Operstor is responsible for ensuring that.I)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly <br /> The following parson(s)ate responsible for performing the monitoring and equipment maintenance: <br /> NAME 2 + " 490 n TITLE ( i 49073 <br /> NAME 490.74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> OPERATOR SIGNATURE <br /> CERTIFICATION:I anion ided herein is and atxarrate to the best of my knowledge. <br /> APPLICANT SIGNA 49076 DATE: }} 490-0 <br /> APPLICANT NAME(Printf: 190 7s APPLICANT TITLE 490.79 <br /> cSSel V � <br /> ihawner- <br /> UPCFUST-D(1212007)N4 --7—Aj PI'ti^ dos -- ptVr'G.+s.,Q q,ti( e4p�,o4x� <br /> Gam l ���'"-T ���`��t►-�. � ��. �..-f� 9- Z -o g' <br />