My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1856
>
2300 - Underground Storage Tank Program
>
PR0231069
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2023 11:45:51 AM
Creation date
6/3/2020 9:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0231069
PE
2361
FACILITY_ID
FA0001909
FACILITY_NAME
STOP N SHOP
STREET_NUMBER
1856
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
123-191-02
CURRENT_STATUS
01
SITE_LOCATION
1856 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231069_1856 W COUNTRY CLUB_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
404
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3" <br /> 3" <br /> Length of Piping Run: Approx. 70' Approx. 50' <br /> Product Stored: Regular 87 Regular 87 <br /> Method and location of Test boot at STP Test boot at STP <br /> i in -run isolation: Piping Sump#1 Piping Sump#2 <br /> Wait time between applying 5 Minutes 5 Minutes <br /> pressure and startin test: <br /> Test Start Time: 9:20 9:25 <br /> Initial Reading(Ri): 3 Psi 3 Psi <br /> Test End Time: 10:20 10:25 <br /> Final Reading(RF): 3 Psi 3 Psi <br /> Test Duration: I Hour 1 Hour <br /> Change in Reading(RF-Ri): 0 Psi 0 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: Pass Pass <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Replaced old Red Icon Secondary Pipe Test Boot on Regular 87 Secondary Pipe at STP Piping Sump,prior to testing. <br /> Replaced old Blue Line Secondary Pipe Test Boot on Super 91 Secondary Pipe at STP Piping Sump, prior to testing. <br /> h T` <br /> n: <br />
The URL can be used to link to this page
Your browser does not support the video tag.