Laserfiche WebLink
Page of <br /> SWRCB,January 2002 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure <br /> ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> Sump# 1-87 Sump#2-91 Sump# Sump# <br /> Sump Diameter: <br /> 42" 42" <br /> Sump Depth: 40 '/s" 35 '/2" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of 14" 15" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 91, 10" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry <br /> Portion of Sump Tested' Water Level 16" Water Level 19" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes <br /> roduct and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed <br /> Is ro system rammed for fail-safe <br /> Y programmed Yes Yes <br /> + j <br /> shutdown? <br /> Was fail-safe verified to be No No <br /> o erational?* <br /> Wait time between applying water 5 Minutes 5 Minutes <br /> and startin test: <br /> Test Start Time: 9:30 9:35 <br /> Initial Reading(Ri): .001 .001 <br /> Test End Time: 10:00 10:05 <br /> Final Reading(RF): .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes <br /> Change m Reading(RF-Ri): 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass <br /> Was sensor removed for testing? Yes Yes <br /> Was sensor properly replaced andYesYes <br /> verified functional after testing?_ <br /> Comments— (include information on repairs made prior to testing, and recommended follow-upfor failed tests) <br /> ' If the entire depth of the sump is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />