Laserfiche WebLink
This procedure applies onl fiberglass underground FCI INSPEO : <br /> storage tanks manufactured by: <br /> Owens-Corning Fiberglass - The tank is tested for benzene and explosive vapor levels <br /> O/C Tanks prior to FCI personnel entry. <br /> Fluid Containment Inc. <br /> The tank is then continuously vented and monitored for <br /> PRE-INSTALLATION: oxygen and flammable vapor levels. The tank may be <br /> entered when the oxygen level is greater than 19.5%and <br /> The ReTank candidate tank is inspected subject to the the flammable vapor level is less than 10%of the tower <br /> following criteria: Explosive Limit. <br /> - The water table must be maintained at or below the - The ReTank candidate tank is inspected internally subject <br /> bottom of the tank to the following guidelines: f <br /> 9 <br /> - The candidate tank must have passed a recent precision - Indentions or other surface discontinuities are less than <br /> test before beginning the ReTank installation 1/2" high. <br /> s <br /> - Deflection of the existing tank does not exceed 3% of Note: Surface irregularities outside of these guidelines will <br /> the original diameter as determined by measuring the require review by FCI personnel and may require special repair <br /> vertical diameter of the tank through a fitting. procedures before the ReTank process can be performed. <br /> - Minimum vertical tank diameter is 89"for a 92"diameter <br /> fiberglass tank. TYPICAL RETANK INSTALLATION <br /> PROCEDURE: <br /> CONTRACTOR PREPARATORY WORK: <br /> - Entry openings are typically cut in one endcap and at <br /> The contractor fills out and submits a"ReTank Job Site each manway location. <br /> Survey"form to Fluid Containment at least 2 weeks before <br /> proceeding with preparations for the ReTank operation. <br /> - The Contractor removes backfill, piping, and electrical <br /> connections from the top of the tank. <br /> - The Contractor arranges for/provides equipment <br /> necessary to unload ReTank equipment and supplies. - Tripods may be installed over the manway hole cutouts. <br /> (Note: This includes pallets and/or 55 gallon drums. It Chain hoists may be attached to the tripods in order to <br /> may also include a large sealed container -8'x 8'x 20' raise the tri-fold panels into position. <br /> Sea-Train) <br /> - The endcap opposite the entry hole is installed in 3 pieces <br /> The tank is then triple-washed,cleaned and defumed, and held in place with jacks until the permanent fiberglass <br /> under the direction of a local contractor(designated as seams are applied. <br /> The Contractor)and in accordance with API Standards, <br /> 2015 Safe Entry And Cleaning Of Petroleum Storage <br /> Tanks, and RP 1631, Interior Lining Of Underground _ <br /> Storage Tanks. Also follow OSHA Regulation 29 CFR <br /> Parts 1910, Confined Space Entry Procedures,as well <br /> as any applicable local safety regulations. <br /> The Contractor is also responsible for providing a back- <br /> hoe and operator for a period of time to assist with the - Prefabricated panels are hinged together in groups of 3 <br /> insertion of ReTank parts. (designated as tri-folds),folded together and secured with <br /> (Note:The period of time for heavy equipment assistance straps. <br /> is typically no more than 2 days after FCI approves the <br /> interior condition of the tank.) Note:The panels are sized so that each tri-fold covers half of <br /> the circumference of the tank. <br /> The Contractor is responsible for maintaining security <br /> barriers around the job site. <br />