My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 2:55:56 PM
Creation date
6/3/2020 9:44:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 REMOVAL AND INSTALL
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_1998 REMOVAL AND INSTALL.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> A tri-fold is lifted by the b e and inserted through LEAK TESTO: <br /> the opening in the end cap and guided into place by FCI - The interstitial space of the new double-wall tank is <br /> r; personnel filled with a dyed brine leak detection fluid. <br /> n � <br /> The tri-fold is opened covering the bottom 180 degrees of - The interior of the ReTank is visually inspected for any <br /> the tank circumference. trace of a leak as evidenced by the presence of dyed <br /> brine. <br /> - The brine level in the reservoir is also inspected. <br /> WRAP UP: <br /> - The tank is measured and strapped for final dimensions <br /> When the tank length requires multiple panels,additional in order to develop a new calibration chart. <br /> bottom tri-folds are installed in the same manner. - After exiting tank,place gasket are placed on manway <br /> The top tri-folds are inserted into the tank and lowered to flanges and cover installed to seal manway. <br /> the tank bottom in a similar manner. BMW <br /> The top tri-fold is attached to the chain hoists connected <br /> to the tripods and raised into position at the top of the <br /> tank. - <br /> The top tri-fold is opened covering the top 180 degrees of Upon the successful completion of the leak test,the tank <br /> the tank circumference and is held in position temporarily is turned over to the Contractor to connect vents,piping, <br /> by jacks. and to complete backfilling and final surface work. <br /> E <br /> - When the tank length requires multiple panels,additional <br /> tri-folds are installed in the same manner. <br /> Field adjustments to the final panel lengths may be <br /> required. If necessary,the panels will be cut to a shorter <br /> length by the FCI technician before or after the panels <br /> are installed in the existing fiberglass tank. <br /> All of the installed panels and end caps joints are bonded <br /> together per the UL procedure and FCI ReTank <br /> specification. <br /> All manways,fittings and other accessories are installed <br /> according to factory specifications. <br /> The remaining endcap is installed and bonded together <br /> in the same manner as the first end cap. <br /> i <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.