Laserfiche WebLink
Installing a Fluid containment <br /> ReTa-nk System <br /> After inspection of the tank to ensure its integrity, all existing piping and electrical connections are <br /> removed. An access hole is cut in the end-cap, as well as holes in the tank top for new manways. <br /> • Starting with a clean tank, the interior is measured and inspected for any cosmetic or minor problems, <br /> • •• '• which are corrected with new applications of fiberglass-,reinforced plastic(FRP).This helps ensure the <br /> original installation was satisfactory. Old deflector plates are removed, replaced,and reinforced with <br /> FRP; all steel fittings are removed. The tank ottom is also reinforced under all old fittings. When <br /> complete, all fittings will 6e consolidated into the manway covers, simplifying future maintenance. <br /> Installation in a Installation in a <br /> Fiberglass Tank Steel Tank <br /> ', rr <br /> Step I —Inspect,expose, Step 1 77,inspect,expose top <br /> evacuate,enter,clean,measure, of tank,evacuate,enfer,clean, ` <br /> remove steel fittings,and reinforce. _mecsure;cut entry hat6,Mv 2 Y <br /> 's <br /> w <br /> rz t <br /> Step 2—`The three pieces of the t,t S I The three pieces of the <br /> new endcap are inserted throughnew.endcap are inserted through <br /> the access hole at the exposed end. the dccess hole m tank to <br /> Step 3—Install the inner Step 3 Install the inner <br /> tank's bottom. ''tank's bottom: <br /> Step 4—Install the inner Step 4-Install the inner <br /> tank's top. tank's top. <br />