Laserfiche WebLink
• <br /> With inspection complete, the three pieces of the first endcap are <br /> installed at the for end of the tank. Once these pieces are in place, <br /> they are laid up with FRP. <br /> t <br /> The bottom of the new, inner tank is inserted into the existing tank as t l ' <br /> three sections (tri-fold) connected by hinges. larger tanks require multiple <br /> tri-folds. Once in place, this tri-fold of sections is opened against the — <br /> bottom half of the existing tank. r <br /> Here the top of the new, inner tank is being positioned. ` <br /> The top of the new, inner tank is also a hinged tri-fold. larger tanks A <br /> require multiple tri-folds. Once in place, it is opened against the upper <br /> half of the existing tank, held in place at the new manway openings. <br /> tlr <br /> The hinges are now removed and all seams and joints are sealed with <br /> ( FRP. This is completed before the final endcap is installed to allow more <br /> light, as well as providing maximum ventilation. <br /> t � <br /> r <br /> 7 -d <br /> r�„Sim xv. � ,;®agni�s•'? �'- `.� <br /> Step 5 —Apply FRP to Y Step 5 Apply FRP to all t <br /> all seams. seams x a <br /> �a <br /> -P-11 <br /> u� <br /> i <br /> i <br /> Step 6—Install the final Step 6--Install the } <br /> endcap and close the outer no endcap <br /> tank access hole. <br /> fi Y <br /> Step 7—Complete the man- Step 7—Complete the <br /> ways,fill annulus with brineanways,fill annulus with <br /> and test. _ limquid and test <br />