My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 2:55:56 PM
Creation date
6/3/2020 9:44:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 REMOVAL AND INSTALL
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_1998 REMOVAL AND INSTALL.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> HL <br /> GROUP INC. <br /> requested. <br /> 6. The Site Safety Officer is Don Moorehead of Paradiso Mechanical,Inc. <br /> 7. The existing monitoring panel is located in the storage room adjacent to the cashier area <br /> and accessible from the cashier area. <br /> 8. The tank cross section,Section 1/Sheet 2DWF-5,has been revised for clarity to represent <br /> the tank as double wall fiberglass. <br /> 9. The tank cross section,Section 6/Sheet 2DWF-5,has been revised for clarity to represent <br /> the tank as double wall fiberglass. The location of the interstitial sensor as noted on Section <br /> 2 and Section 6 of sheet 2DWF-5 if typical of all tanks. <br /> 10. Please see the enclosed application for clarification of overfill prevention. <br /> 11. Please see the enclosed application,page 6,#14(B)(a),for clarification on monitoring. <br /> 12. Please find enclosed the cut sheet for the existing Gilbarco dispensers currently being used <br /> at this site. As mentioned in the scope of work for this project,the existing dispensers are <br /> to be reinstalled after installation of the under dispenser containment. <br /> 13. Please see the enclosed application,page 8,#19(E),for clarifications. <br /> If you have any additional comments or require additional information,please do not hesitate to call. <br /> Sincerely, <br /> RHL Design Group,In <br /> • <br /> Dennis Scovi e <br /> Job Captain <br /> encl. <br /> BELLEVUE, WA LA HABRA, CA PETALUMA, CA SCOTTSDALE, AZ <br />
The URL can be used to link to this page
Your browser does not support the video tag.