My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_1998 REMOVAL AND INSTALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 2:55:56 PM
Creation date
6/3/2020 9:44:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 REMOVAL AND INSTALL
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_1998 REMOVAL AND INSTALL.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
497
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Review Comments, Public Health Services ; <br /> �V <br /> Project Applicant: Circle"K"#11193 ,; <br /> Project Address: 3202 W. Hammer Ln., Stockton, CA <br /> Reviewer: Michael Kith Review Completed: October 20, 1998 <br /> (209) 468-3420 <br /> This return comment will follow format and item number from a letter dated 10.20.98 from Michael Kith. <br /> Return comments: i <br /> 1. Enclosed please fmd UST removal permits. <br /> 2. Specification for tank model is noted on drawing 2SWF-4 <br /> 3. See revised drawings included. <br /> 4. See attached copies of Tank manufactures installation instructions. <br /> 5. The monitor system is existing. "Cut sheets"for the existing system is included. <br /> 6. Sensor location to be determined on site. <br /> 7. See attached monitor and response plan by General Contractor. <br /> 8. See attached Buoyancy calculations by RHL. <br /> 9. The correct cut sheets for the spill containment has been included. <br /> 10. The correct cut sheets have been included. <br /> 11. New piping will be double-walled fiberglass. Drawings have been revised. <br /> 12. The correct cut sheets have been included. <br /> 13. All site specifics cut sheets are included in this package. <br /> 14. Drawings have been revised to show installation of new equipment. <br /> 15. Contractors certificate of training is included in this package. <br /> F <br /> End of comments <br />
The URL can be used to link to this page
Your browser does not support the video tag.