My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2004-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2023 2:36:32 PM
Creation date
6/3/2020 9:45:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2007
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2004-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 3 <br /> 5. SECONDARY PIPE TESTING 10 <br /> Test Method Developed By: FX Tank Manufacturer F-1 Industry Standard Professional Engineer <br /> El Other (Specify) <br /> Test Method Used: M Pressure ❑ Vacuum F Hydrostatic <br /> Other (Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# 1 reg Piping Run# 2 sup Piping Run# 3 dsl Piping Run# <br /> rPipmgMaternial: fiberglass fiberglass fiberglass <br /> acturer: smith smith smith <br /> Piping Diameter: 311 311 311 <br /> Length of Piping Run: 1401 1401 1401 <br /> Product Stored: reg sup dsl <br /> Method and location of reg sup dsl <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 7:43 7:48 7:4 8 <br /> Initial Reading(F4 ): 3 psi 3 psi 3 p s i <br /> Test End Time: 8:43 8:48 8:48 <br /> Final Reading(RF ): 3 psi 3 psi 3 psi <br /> Test Duration: 1 hr 1 hr 1 hr <br /> Change in Reading(RF-14 ): 0 psi 0 psi 0 psi <br /> Pass/Fail Threshold or 0 psi 0 psi 0 psi <br /> Criteria: <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.