My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 4:28:20 PM
Creation date
6/3/2020 9:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2008-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S WRCB,January 2002 Page_2_of—7- <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: ❑ Tank Manufacturer ®Industry Standard E]Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ❑ Pressure ®Vacuum ❑ Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: 0—30"VACUUM GAUGES Equipment Resolution: +/-0.002" <br /> Tank#87 Tank#91 Tank#DIESEL Tank# <br /> rTank mpt From Testing?' ❑ Yes ®No ❑Yes ®No ❑Yes ®No ❑Yes ❑No <br /> ty: 10000 GAL. 10000 GAL. 10000 GAL. <br /> Tank Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Tank Manufacturer: XERXES XERXES XERXES <br /> Product Stored: 87 91 DIESEL#2 <br /> Wait time between applying <br /> pressure/vacuum/water and 10 MIN 10 MIN 10 MIN <br /> starting test: <br /> Test Start Time: 8:00 AM 8:00AM 8:00 AM <br /> Initial Reading(RI): -10" -10" -10" <br /> Test End Time: 9:00 AM 9:00 AM 9:00 AM <br /> Final Reading(RF): -10" -10" -10" <br /> Test Duration: 1 HR 1 HR 1 HR <br /> Change in Reading(RF-RI): 0" 0" 0" <br /> Pass/Fail Threshold or Criteria: NO LOSS NO LOSS NO LOSS NO LOSS <br /> Test Result: Z Pass ❑Fail Z Pass ❑Fail ®Pass ❑ Fail ❑Pass ❑Fail <br /> Was sensor removed for testing? ®Yes ❑No ❑NA ®Yes ❑No ❑NA ®Yes [:]No ❑NA ❑Yes ❑No [:]NA <br /> Was sensor properly replaced and <br /> verified functional after testing? ®Yes El No [INA ®Yes [I No F-1NA ®Yes [:1 No [INA El Yes [I No El NA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23, Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.