My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2021 4:28:20 PM
Creation date
6/3/2020 9:45:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0231129
PE
2361
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95209
CURRENT_STATUS
01
SITE_LOCATION
3202 W Hammer Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231129_3202 W HAMMER_2008-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S WRCB,January 2002 Page_3_of—7- <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: 0—15 PSI GAUGES Equipment Resolution: +/_0.002" <br /> Piping Run#87 Piping Run#91 Piping Run# Piping Run# <br /> DIESEL <br /> Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: AMERON AMERON AMERON <br /> Piping Diameter: 2"/3" 2"/3" 2"/3" <br /> Length of Piping Run: 95' 100' 105' <br /> Product Stored: 87 91 DIESEL#2 <br /> Method and location of TEST BOOT/STP TEST BOOT/STP TEST BOOT/STP <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 MIN 10 MIN 10 MIN <br /> starting test: <br /> Test Start Time: 8:00 AM 8:00 AM 8:00 AM <br /> Initial Reading(RI): 5.0 PSI 5.0 PSI 5.0 PSI <br /> Test End Time: 9:00 AM 9:00 AM 9:00 AM <br /> Final Reading(RF): 5.0 PSI 5.0 PSI 5.0 PSI <br /> Test Duration: 1 HR 1 HR 1 HR <br /> Change in Reading(RF-RI): 0 PSI 0 PSI 0 PSI <br /> Pass/Fail Threshold or NO LOSS NO LOSS NO LOSS NO LOSS <br /> Criteria: <br /> Test Result: ED Pass ❑ Fail Pass ❑Fail CK Pass ❑Fail ❑Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.