My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_1986-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 1:00:00 PM
Creation date
6/3/2020 9:45:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-1997
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_1986-1997.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STOCN SERVICE <br />STATIO EQUIPMENT CO., INC. <br />CALIFORNIA CONTRACTOR LICENSE 309105 C-61, SA <br />808-820 N. UNION ST. STOCKTON CAUF. 95205 <br />P.O. BOX 508 STOCKTON CAUF. 5201 <br />PHONE 209/464-8333 �AX 209/464-8349 <br />TAX I.D. #94-1573741 <br />SALES • SERVICE • INSTALLATION OF PETROLEUM DISPENSING • . LUBRICATION A INDUSTRIAL SERVICE EOUIPMENT <br />Locations S. J. County Court House <br />1810 E. Hazelton Ave. <br />Stockton, Ca. 95205 <br />Contractor: Stockton Service Station Eq. Co. <br />820 No. Union St. <br />Stockton,Ca.95205 <br />Will remove all remaining product from tank dig down to top of <br />tank by use of backhoe and purge tank with Dry ice 3 lbs. per <br />100 gallon 45 minutes prior to lifting tank. Once the Health Dist. <br />Inspector,Fire Inspector,Ericksen Inc.& Water Works Lab. are on <br />site we will lift tank and place on Erickson Inc.(waste hauler) <br />trailer and then by use of Backhoe bucket will take sample from <br />bottom of tank hole then Water Works Lab. will take sample out <br />of Backhoe bucket with brass tubes and take back to Laboratory <br />and analized for the following. <br />TPH-D BTX&E <br />GC -FID (8020) <br />(5030) <br />Turn around time for soil results 14 days for tank disposal <br />receipt approx. 30 days. <br />NOTE: 1. Fire permit will be obtained and on site. <br />2. All related piping will hauled by Erickson Inc. <br />3. No concrete pad under tank. <br />4. No septic tank. <br />5. No water wells. <br />6. If any utilities are in area they will be shut off <br />or disconnected prior to excavation. <br />Mike Flores <br />
The URL can be used to link to this page
Your browser does not support the video tag.