Laserfiche WebLink
SWRCB, January 2002 <br />Page J of <br />Test Method Developed By: <br />Piping Manufacturer X, Industry Standard U Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />? Pressure <br />U Other (Spec) <br />❑Vacuum ❑Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />Piping Material: <br />Piping Run # 1 <br />Fiberglass <br />Piping Run # 2 Piping Run # Piping Run # <br />Fibex-glass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />3 inch <br />3 inch <br />Length of Piping Run: <br />45 ft. <br />44 ft. <br />Product Stored: <br />Unlead <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Boot in SuiTp <br />Boot in Sump <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Five Min. <br />Five Min. <br />Test Start Time: <br />A -Ss <br />9:04 <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />1 Hour <br />1 Hour <br />Change in Reading (Rt-Rj): <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss <br />No Loss <br />Test Result: <br />N, Pass, Q Fait <br />I Pass . D --Fait Q Pass . Cl Fail Q Pass D Fail <br />Comments —(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />