My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:02:37 PM
Creation date
6/3/2020 9:45:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Page J of <br />Test Method Developed By: <br />Piping Manufacturer X, Industry Standard U Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />? Pressure <br />U Other (Spec) <br />❑Vacuum ❑Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />Piping Material: <br />Piping Run # 1 <br />Fiberglass <br />Piping Run # 2 Piping Run # Piping Run # <br />Fibex-glass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />3 inch <br />3 inch <br />Length of Piping Run: <br />45 ft. <br />44 ft. <br />Product Stored: <br />Unlead <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Boot in SuiTp <br />Boot in Sump <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Five Min. <br />Five Min. <br />Test Start Time: <br />A -Ss <br />9:04 <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />1 Hour <br />1 Hour <br />Change in Reading (Rt-Rj): <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss <br />No Loss <br />Test Result: <br />N, Pass, Q Fait <br />I Pass . D --Fait Q Pass . Cl Fail Q Pass D Fail <br />Comments —(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.