Laserfiche WebLink
S W RCB, January 2002 <br />6. PIPING SUMP TESTING <br />Page-4—of <br />Test Method Developed By: <br />] Sump Manufacturer XJ Industry Standard : Professional Engineer <br />7 Other (Specify)' <br />Test Method Used: <br />J Pressure <br />Other (Spec) <br />❑ Vacuum <br />X Hydrostatic <br />Test Equipment Used: <br />24 HOUR LAKE gT <br />Equipment Resolution: <br />rSum,pDiameter: <br />Sump # I <br />42 inch <br />Sump # <br />Sump # Sump # <br />42 inchDepth: <br />36 in <br />38 inMaterial: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />17.5 in. <br />17.5 in <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />11 in <br />9.5 in <br />Condition of sump prior to testing: <br />Dry <br />Dry <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />roduct and waterp. <br />X' Yes No NA <br />� 1 <br />Yes' No � NA <br />C7 Yes L' No .J NA �_] Yes J No <br />❑ NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?' <br />Xl Yes No NA <br />X1 Yes i ; No l INA <br />C� Yes Cl No ❑ NA ❑ Yes .-JNo <br />.. NA <br />Was fail-safe verified to be <br />operational?' <br />"-_ Yes <br />x No NA <br />X, yes : No i:7 NA <br />[]Yes ,J No ❑ NA ]Yes ':.,!No <br />; _j NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />10 min <br />10 min <br />Test Start Time: <br />Initial Reading (Rj): <br />_ <br />Test End Time: <br />9-40 11-2,141102) <br />9-50 (1911,4102) <br />Final Reading (110: <br />Test Duration: <br />24 Hburs <br />24 Hburs <br />Change in Reading (RF-Ri): <br />Pass/Fail Threshold or Criteria: <br />114tv in 24 Hr. <br />" in 24 Hr. <br />Test Result: <br />R Pass 0 Fair <br />EkPass C7 F II _ <br />"b Paras DY, atl "(1 Pass ,.: 11 Fail ; <br />Was sensor removed for testing? <br />Yes No NA <br />x1 Yes i_ ] No 1 NA <br />❑ Yes '-',,No FJ NA 11 Yes No <br />`] NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />Yes No I _i NA <br />Yes '. 7 No a NA <br />❑ Yes ❑ No -; NA C! Yes �No <br />[ ' NA <br />Comments - (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to am of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />