My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:02:37 PM
Creation date
6/3/2020 9:45:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page b <br />8. FILL RISER CONTAINMENT SUMP TESTING <br />Facility is Not Equipped With Fill Riser Containment Sums ❑ <br />of <br />Fill Riser Containment Sumps are Present, but were Not Tested <br />Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />D Other (Specify) <br />Test Method Used: <br />❑ Pressure ❑ Vacuum <br />❑ Other (Specify) <br />❑ Hydrostatic <br />Test Equipment Used: <br />Sump Diameter: <br />Fill Sump # Fill Sump # <br />Equipment Resolution: <br />Fill Sump # Fill Sump # <br />Sump Depth: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to <br />testing: <br />Portion of Sump Tested <br />Sump Material: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Ri : <br />Pass/Fail Threshold or Criteria: <br />Test Result: <br />:0T, ss ` 0 V40, <br />Is there a sensor in the sump? <br />❑ Yes D No ❑ Yes ❑ No <br />❑ Yes ❑ No ❑ Yes <br />❑ No <br />Does the sensor alarm when <br />either product or water is <br />detected? <br />El Yes No 7 NA <br />❑ Yes [I No ❑ NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No <br />❑ NA <br />Was sensor removed for testing? <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No Cl NA <br />❑ Yes ❑ No ❑ NA ❑ Yes ❑ No <br />❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />❑ Yes ❑ No ❑ NA <br />11 Yes 11 No ❑ NA <br />❑Yes Ll No El NA L1 Yes Ll No <br />P-NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.