My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:02:37 PM
Creation date
6/3/2020 9:45:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Page J5 of -9— <br />Test Method Developed By: <br />UDC Manufacturer XI Industry Standard , Professional Engineer <br />❑ Other (Spec) <br />T <br />Test Method Used: <br />a Pressure <br />Other (Specify) <br />f_:! Vacuum <br />Hydrostatic <br />Test Equipment Used: <br />Equipment Resolution: <br />UDC Manufacturer: <br />UDC # 1 <br />UDC <br />UDC # SAT Diesel, UDC # <br />UDC Material: <br />UDC Depth: <br />30 inch <br />30 inch <br />30 inch <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />8 in <br />9.5 in. <br />9 in. <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />9.5 in, <br />12 in <br />13.5 in. <br />Condition of UDC prior to <br />testing: <br />DRY <br />DRY <br />DRY <br />Portion of UDC Tested <br />11 .5 in. <br />14.5 in. <br />12.5 in. <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />xYes No NA <br />XYes i i No _I NA! <br />Yes I -i No NA Yes C] No <br />' i NA <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown?' <br />Yes No NA <br />X <br />Yes �4_'No JNA <br />X Yes I_] No NA 1.1 Yes No <br />[-INA <br />Was fail-safe verified to be <br />operational?* <br />`x es ] No NA <br />Yes [ 1 No i� NA <br />l Yes F1No a NA i J Yes ❑ No <br />:" NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />10 min. <br />10 min. <br />10 min. <br />Test Start Time: <br />0 (12/3/02 <br />10:00 (12/3/0Z <br />Initial Reading (RI): <br />125 <br />Test End Time: <br />Final Reading RF): <br />Test Duration: <br />Chane in Reading (RF-Rj): <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />114" in 24 Ur <br />Y, <br />...J.14.2 in 7A Rr, <br />" in 24 Hr <br />Test Result: <br />Pass Q Fail <br />Pass Fail: <br />Pass Q.Fail L7 Pass D, Fait <br />Was sensor removed for testing? <br />1:kYes _' No NA <br />;XYes E No I j NA <br />R1 Yes F1 No i 1 NA Yes D1, No <br />' : NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />i�cYes 77 No NA <br />Yes i _ No `- . NA <br />Yes ,_- No _ NA G Yes :_ No <br />NA <br />Comments —(include information on repairs made prior to testing, and recommended"follow-up for failed tests) <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.