Laserfiche WebLink
` . "Hard Angle repair Instructions <br /> For any "Hard Angle" Conduit Repair Kit <br /> For Existing Conduit pipe from 1/2"to 1.5"OD in Direct Burial Application repairs <br /> Page 2 <br /> STEP 5:Seal around the old boot&pipe <br /> l <br /> You must Sealeny Open 1 Seal around the existing boot &pipe if needed. <br /> I <br /> I spaces between the pipe Apply a thick bead of an approved sealer between the old boot&the pipe, <br /> i as needed to fill any cracks or openings. <br /> &Old Boot' <br /> i'is x S.mast r1 ._ , c ,.?s.a"�_ ..stalk;{g.f82'.rr*,3'3e.. 3x .i:. <br /> z STEP 6: Install The Repair Boot&Insert <br /> If the Bonding Ring is used,DO THIS PART 11t: <br /> ` apply a thick bead of Zi -T or DBF 16 all around the sealing surface of the Bonding Ring <br /> Use this step If the studs I Slide the Bonding Ring over the over the studs&press firmly to the sump wall <br /> from the original fitting Start here if the Bonding Ring is not used or after the Bonding Ring is in place against the sump wall: <br /> I were LEFT IN PLACE Apply a thick bead of Zila-Tite or DBF 11 all around the sealing surface of the repair boot <br /> Slide the repair boot over the studs with the fill ,n3rt at tt f-tr;ts <br /> lstall tile=ian e Nut —Do o!`Jc t over�i�f:ter�_ -Sr1ut Es elc <br /> a- Install the Insert&Clamp <br /> • Apply r ioTite to the out surface of the Insert&press into the end of the repair boot <br /> Set the Clamp over the pipe end of the repair boot. <br /> 'A2� STEP 6A: Install The Repair Boot&Insert <br /> � .._-.• �----�-. ,�..--.•-�-•-.••w-•-- If the Bonding Ring is used,DO THIS PART 11t: <br /> Use this step if the studs _ Apply a thick bead of Zirs-rite or DBF St all around the sealing surface of the Bonding Ring <br /> xr'�c 'I Slide &Position the Bonding Ring up to&press firmly to the sump wall <br /> m I from the original fitting I <br /> a were REMOVED. _ Start here if the Bonding Ring is not used or after the Bonding Ring is in place against the sump wall: <br /> • Apply a thick bead of Z,i _Tite or DBF it all around ther sealing surface of the repair boot <br /> Slide the repair boot up to the sump wall or up to the Bonding Ring with the f€l! o t;t tt p <br /> Install the Insert&Clamp <br /> q Apply 7aTite to the out surface of the Insert&press into the end of the repair boot <br /> • Set the Clamp over the pipe end of the repair boot. <br /> A111111111116— <br /> Step 7: Fill With DBF II,Insert Fill Plug TC3C3L5 ft t1iRE PRODUCTS NEEDED` <br /> Assemble DAG&DBF II(see instructions on DPM website). Gloves and Static Mixer DBC Cleaner <br /> • Purge 1-2 oz. 7/16"Nut driver (for flange nuts) Zip-Tite Bonder <br /> • Fill fitting slowly. 5/16" Nut driver (for Band Clamps) DBF II Polysulfide Liquid Fill <br /> • Insert fill plug when filling is completed. DAG Caulk Gun (for DBF II) <br /> DAGP Caulk Gun (Pneumatic version for DBF II) Paas in licit: <br /> n <br /> • Repair Boot,Split URBKZ C45 x x (to match pipe size) <br /> Clean any spilled DBF II with DBC and dispose <br /> FILL Volu <br /> of remaining products per instructions local requirements. s e° (per re air kttsc�`} 2 clamps 1#72,1#xx(to match parts) <br /> Volume of DBF II needed = 4 oz for 1",5 oz for W pipe Fill Port Plug RFA xPlug <br /> Notes t1se,I';errao ft Fill option if access is)united Volume of Zip-Tite needed = 1/2 Oz Repair Instructions <br /> Volume of DBB V needed = 13 ML <br /> Note: After 1 hour the mpaia job may beyrires-static tested <br /> Diversified Products Manufacturing Inc. 5523 Baggett Marysville Road,Oroville,CA 95965 530-534-3966 www.dpm-llc.com <br />