My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:15:12 PM
Creation date
6/3/2020 9:45:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proper installation of each tank sump is essential: • Read, understand and follow these instructions. <br /> • To ensure the safety of all the individuals involved in ° Barricade the work area. <br /> the installation. <br /> • To prevent sump damage and/or failure, which could ° Review and prepare complete the installation <br /> lead to product loss and environmental contamination. checklist as the installation progresses. <br /> • To validate the sump warranty. If you have questions on other sump installation <br /> details, call CSI Technical Support. <br /> To prevent fire or explosion hazard,CSI recommends <br /> air driven tools whenever possible.DO NOT use power <br /> Do not enter tank or sumps unless following OSHA tools where flammable vapors or liquids exist.Also,when <br /> electric hand tools are used, be aware of potential shock <br /> guidelines for confined space entry. Failure to hazards.Wear protective clothing and eye protection. <br /> follow OSHA guidelines could result in death or <br /> serious injury. e • <br /> t IL A <br /> • <br /> • r In freezing conditions,protect collar and sump from water <br /> accumulation. Freezing water may cause damage. <br /> ASPHYXIATION FIRE EXPLOSION • Visually inspect the sump components for shipping <br /> damage. If damage is found, contact CSI Field <br /> Service. <br /> • • - � • Wear gloves. <br /> • Do not roll, drop, or bounce. <br /> • Sumps must be installed according to these • Set on smooth surface. <br /> instructions and NFPA 30, 30A, 31,OSHA and all . The sump must be secured to prevent damage from <br /> applicable Federal, State, Local, or Provincial, high winds. Proper precautions should be taken to <br /> construction, safety and environmental codes and protect adhesive channels. <br /> regulations. <br /> • Any variances or deviations which are in direct • <br /> conflict with these published installation instructions <br /> must be approved in writing prior to the installation by <br /> Containment Solutions Tank Technical Support. Sump must be isolated from direct traffic loading. <br /> • The presence of any Containment Solutions <br /> representative at the job site does not relieve the Dry fit all sump components. <br /> contractor of responsibility to follow these installation - Determine any length changes required to insure <br /> instructions. the minimum required clearance between the sump <br /> top and concrete. <br /> e - Confirm enclosure top is level. <br /> • If required, trim sump body extension using a carbide <br /> • These instructions must be followed. tipped blade or a masonry blade (see Figure B-1). <br /> • The Installation Checklist must be properly completed • Field cuts must be within ±'/4"of square. Gaps <br /> and signed by the tank owner's representative and between two joints greater than /4' must be covered <br /> the installing contractor. with a maximum 1/2"wide tape. <br /> • The Sump Installation Checklist, these instructions, • Remove any rocks, and/or debris from channel. <br /> and any correspondence related to the sump • Sand and clean mating surfaces until white in color. <br /> installation must be retained by the tank owner and - Adhesive Joints-Sand all the surfaces that will <br /> provided to CSI to validate any future warranty claim. contact the adhesive, then wipe free of dust with a <br /> • The sump must be continuously monitored for piping clean cloth. <br /> leaks using an electronic leak monitoring sensor. - Layup Joints- Sand a minimum of 4"onto each <br /> • The sump must be tested using one of the part where the layup will be applied, then wipe free <br /> procedures described in this manual. of dust with a clean cloth. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.