My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2010-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 3:15:12 PM
Creation date
6/3/2020 9:45:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2012
RECORD_ID
PR0231141
PE
2361
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
01
SITE_LOCATION
1810 E HAZELTON AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231141_1810 E HAZELTON_2010-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> - Ensure mating surfaces are free of contaminants. Warm Weather(between 61°F and 85°F): <br /> - Do not use oil-based solvents, soap, or water to • Adhesive or hand layup will harden in approximately <br /> clean surfaces. 30 minutes. <br /> Figure B-1 • No supplemental heat required. <br /> Hot Weather(above 850F): <br /> Sump Body • Apply adhesive or layup more rapidly (adhesive and <br /> Extension resin may harden in less than 10 minutes). <br /> To adjust for with WT, • To increase working time, cool the adhesive or resin <br /> the burial FF,or OT to 60°F to slow down chemical reaction. <br /> depth,trim Enclosure Top <br /> from bottom ALL ADHESIVE JOINTS (KIT AD) <br /> Sand and FOLLOW THESE STEPS: <br /> Optional clean all joint 1. Check adhesive container for expiration date. <br /> Polygon areas prior <br /> or Round to applying 2• Thoroughly mix two part adhesive by hand or with <br /> Sump Body Adhesive or a powered mixer following the mixing instructions <br /> hand layup contained in the adhesive kit. <br /> f 3. Fill channel with adhesive using the grout bag or <br /> application tool. <br /> 4. Make two consecutive 360° passes with adhesive <br /> Collar around each channel. <br /> 5. Allow adhesive to cure at least 24 hours without <br /> moving the joined parts.The surface of the <br /> • Position sump on collar(see Figure B-1). <br /> adhesive should be hard. <br /> • Use a rubber mallet, if necessary to seat sump on Figure C-1 <br /> collar. <br /> +-Body <br /> • Confirm that surfaces and/or adhesive channels <br /> are dry and clean before mixing or applying the Adhesive <br /> (Kit Aon <br /> adhesive. <br /> Adhesive <br /> ' Channel <br /> The adhesive/resin materials and vapors are flammable. <br /> To prevent fire or explosion hazard,if a heat gun(or Collar or Body <br /> other ignition source) is used for supplemental heat,first <br /> evacuate flammable vapors which may accumulate in the <br /> sump. ALL LAYUP JOINTS (KIT LK) <br /> - FOLLOW THESE STEPS: <br /> 1. Thoroughly mix resin and catalyst following the <br /> Always wear protective goggles and gloves when mixing mixing instructions in the layup kit. <br /> and applying adhesive and resin.The liquid materials <br /> are flammable.Keep adhesive and resin away from 2. Resin coat previously ground mating surfaces. <br /> sparks and ignition sources. 3. Apply 3 layers of glass layup saturated with resin <br /> 3601 around sump, centered on joint.All layup <br /> TEMPERATURE CONSIDERATIONS: joints must overlap a minimum of 1" but not exceed <br /> • Recommended method for supplemental heat is to 2" in circumferential direction. <br /> transfer warm air to the sump while keeping ignition 4. Using the ribbed roller supplied in the kit, hand roll <br /> sources away. over entire surface of layup, working air bubbles or <br /> Cool Weather(less than 600F): entrapped air bubbles or entrapped air from under <br /> • Preheat the resin or adhesive to 60-75°F. the fiberglass mat. <br /> • Before adhesive or layup is applied, add 5. Allow layup to cure at least 24 hours without <br /> supplemental heat.Apply heat to keep joint surfaces moving the joined parts.The surface of the layup <br /> over 60°F. should be hard <br /> • After adhesive or layup is applied, continue to apply <br /> supplemental heat until it hardens(30 minutes <br /> minimum). <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.